Wyoming has one of the highest wind power potentials of any state in the United States. In 2019, Wyoming had wind powered electricity generating capacity of 1,589 MW, which produced 9.85% of its electric generation, with an additional 3,753 MW under construction. However, the wind generation in that year was Wyoming's third-lowest in the 2010s. By 2020, wind capacity increased to 2738 MW and 8448 gigawatt-hours of electricity were produced from wind in 2021, more than double 2019 production. Additional wind capacity and needed transmission lines are under construction or planned, despite political headwinds from Wyoming's strong coal and oil sectors.

Resource

Wyoming's geography of high-altitude prairies with broad ridges makes the state an ideal site for the development of wind resources. Other factors that positively affect Wyoming's wind power development potential include transmission capabilities, the high energy needs of nearby population centers, high public support of wind power development in the state (97% support), and the historical importance of energy sectors to the state's economy.

Wind power in Wyoming

Disadvantages to large-scale wind power production include competition from fossil fuels industry, as coal power provided 42.7 TWh (90%) of Wyoming electricity in 2016, compared to 3.8 TWh for wind. Wyoming taxes wind power with $1/MWh which provided the state with $3.8 million in 2015.

Wind power in Wyoming

The Big Hollow is a wind eroded deflation basin located to the west of Laramie, Wyoming in the United States. It is the second largest wind eroded depression in the world. The Big Hollow is the largest deflation basin in North America.

Wind power in Wyoming

History

The first two wind turbines in Wyoming were constructed in Medicine Bow on September 4, 1982, by the National Aeronautics and Space Administration and the United States Department of Energy. The wind turbines were the largest in the U.S. The two turbines included the WTS-4 at 391 feet tall, and the MOD-2 at 350 feet tall. Mayor of Medicine Bow Gerald Cook held an event with 500 residents at the construction site and declared September 4 "Wind Turbine Day."

Wyoming's first commercial wind farm was the Foote Creek Rim wind project located near Arlington completed on April 4, 1999. This 85 MW (megawatts) wind project had 69 wind turbines, and it is located in one of the windiest locations in the state. Due to average winds of 25 mph in the area, the wind project has a capacity factor of 43% of peak output annually, which is higher than most wind farms. As of 2016, the Foote Creek wind project has 183 turbines with a generating capacity of 134.7 MW.

In 2003, the Wyoming Wind Energy Center began operations. It has 80 turbines with a 144 MW capacity and is located near Evanston in Uinta County.

In 2008, the Glenrock Wind Project outside of Glenrock began operations on top of a reclaimed surface coal mine. PacifiCorp, the owner, "believe[s] this is the first wind facility in the West to recycle land that once provided fossil fuels into one that captures renewable energy." The wind project has 66 turbines that generate up to 99 MW, later up to 158 MW.

Seven Mile Hill and Seven Mile Hill II began operations between Hanna and Medicine Bow. It has 79 turbines with a generating capacity of 118.5 MW. In 2008, Mountain Wind Power, LLC and Mountain Wind Power II, LLC began operations. They have 67 turbines with a 140 MW capacity.

As of 2016, Wyoming had 1,489 megawatts (MW) of wind powered electricity generating capacity, responsible for 9.42% of in-state electricity production. Wyoming produced of 3,800 GWh in 2015, about 9% of the total.

In November 2008, the New York Times reported a land rush in Wyoming in anticipation of future wind power development projects. Citizens and land-owners in Wyoming have formed numerous "wind associations" in the hopes of collectively bargaining for higher compensation for the use of their land in wind power production and transmission projects. Most of these associations are located in the wind-power dense counties of southeastern Wyoming, including Platte, Converse, Goshen and Laramie counties.

In 2010, the High Plains and McFadden Ridge Wind Energy Project near Rock River began operations with 66 turbines. It has a capacity of 99 MW. Three Buttes Windpower, LLC, began operations in Converse County near Glenrock and has 66 turbines with a 99 MW capacity. Casper Wind Farm began operations near Casper in Natrona County and has 11 turbines with a generating capacity of 16.5 MW.