Egypt has no operational high-speed rail links, but a project was launched in 2018 to construct three such lines with a total length of about . The first line links the cities of Ain Sukhna and Marsa Matrouh, the second connects the cities of Sixth of October and Abu Simbel, and the third connects the city of Qena with the cities of Hurghada and Safaga.

The project is being established by a coalition of German Siemens companies, the Arab Contractors and Orascom Construction, where Siemens will carry out all the works of the project's electrical, mechanical, control and control systems, as well as the manufacture and supply of electric trains, the establishment of a maintenance workshop and the installation of its equipment, while the Arab Contractors and Orascom companies implement earth bridges, bridges, and industrial works for track, passenger terminals and fences.

High-speed rail in Egypt

Once completed, the railway system will be operated and maintained by Deutsche Bahn.

High-speed rail in Egypt

History

On 12 March 2018, Egypt's Transport Minister Hisham Arafat said that Egypt is in the process of launching a new high-speed railway linking the Mediterranean (Most likely referring to the northern coastal governorates like Alexandria, Beheira) and the Red Sea with the participation of more than 10 international companies.

High-speed rail in Egypt

In January 2021, Egypt's authorities signed a declaration of intent with a consortium led by Germany's Siemens company, with the first contract of 4.5 billion Euro for 660 km of the high-speed railway issued in September 2021. In May 2022, the contract was extended to encompass the complete 2000 km track with a budget totaling 8.1 billion Euros (US$8.7 billion).

In November 2022, DB International Operations, a subsidiary of Deutsche Bahn, won the contract to operate and maintain Egypt's high-speed rail network after completion.

Train lines

Red line

The first 660 km was planned to begin at Mersa Matruh on the Mediterranean Sea, pass through Al-Alamein, Borg El Arab, then to Wadi El Natroun, on to the 6th October City, through southern Cairo to the New Administrative Capital, and end in Ain Sokhna on the Gulf of Suez of the Red Sea. As of January 2021, surveying and route planning have been completed and construction is underway to build bridges and track. This initial segment is intended to be used for both passengers and freight, and is projected to cost US$3 billion with a completion date of 2023. On 14 January 2021, a Memorandum of understanding was signed between Siemens Mobility and the National Authority of Tunnels, an authority under the Ministry of Transportation of Egypt to design, install, and maintain Egypt's first high-speed rail system. The initially-dubbed "second line" between Alexandria and Borg El Arab was combined into this contract, and both are under construction as of 2022. The Siemens-led consortium was awarded a $4.5 billion contract to build the lines from Ain Sokhna to Marsa Matruh and to Alexandria in September 2021, and is scheduled for completion in 2027. The line will be outfitted with Velaro high-speed passenger trains. This 660 km segment will be designed to carry up to 30 million passengers annually, cut travel times in half, and cut carbon emissions by 70%. Design speed of the new railway line is going to be 250 km/h, while high-speed trains are going to reach 230 km/h during normal service.

Yellow line

A second line will stretch from Sixth of October City through Fayoum, Minya, Aswan, and Abu Simbel over 1,100 km on the west bank of the Nile. Local stations will include Al-Ayat, Al-Fashn, Al-Adwa, Bani Mazar, Samalout, Abu Qurqas, Mallawi, and Dayrout. Survey and construction work for this line began in March 2022 by Egyptian authorities, especially around 6 October City and Fayoum, with an anticipated design speed of 250 km/h, but preliminary operation of express trains at 230 km/h. An extension of this line was announced in May 2022 from Aswan through Abu Simbel to Toshka and Sharq El Owainat in the Western Desert, as well as an extension to Wadi Halfa, in Sudan. The Kuwait Fund for Arab Economic Development signed a $2.45 million feasibility study for a 283.5 km line from Aswan to Toshka and Abu Simbel, as well as the 80 km extension to Sudan, which includes a 6 km bridge across Lake Nasser.