The Madrid–Levante high-speed network is a network of high-speed rail lines that connects Madrid with the Mediterranean coast of the Levante Region, specifically with Castilla-La Mancha, the Valencian Community and the Murcia Region autonomous communities.

The network extends from Madrid to the east, with branches ending in Castellón, Alicante, Elche, Murcia, Cartagena and continuing from Murcia to Almería.

Madrid–Levante high-speed rail network

When fully operational the Madrid–Levante network will total of high-speed rail capable of top speeds of in the majority of its segments.

Madrid–Levante high-speed rail network

Segments

Madrid–Cuenca–Motilla del Palancar–Valencia

The first of this line are shared with the existing Madrid–Seville high-speed rail line. The section onwards to Valencia was inaugurated on 15 December 2010 and entered service on 19 December 2010.

Madrid–Levante high-speed rail network

Thirty trains run every day, fifteen in each direction. 22 are non-stop services and the remaining eight call at intermediate stations.

Non-stop trains between Madrid and Valencia cover the in 1 hour and 40 minutes, saving two hours on the previous service of Alaris trains on the classic line.

The line is built to , and electric powered at 25 kV AC, with signalling ERTMS levels 1 and 2.

Valencia–Castellón

This segment was inaugurated on 22 January 2018 and is a part of the Mediterranean Corridor. With this extension to Castellón a new AVE service Madrid-Castellón was introduced which cut the journey time between the two cities by further 30 minutes to total 2 hours and 25 minutes.

Four AVE trains per day are scheduled, two in each direction between Madrid and Castellón while this segment is also used by the Alvia service Gijón–Castellón.

Valencia–Xàtiva

Segment under construction. Planned for mixed use (goods and passengers).

Xàtiva–Nudo de La Encina

This segment is in service with a maximum speed of .

Motilla del Palancar–Albacete

A segment between Cuenca and Albacete provinces. This section was inaugurated on 15 December and open to the public on 19 December 2010.

Albacete–Nudo de La Encina–Monforte del Cid–Alicante

The section from Albacete to Alicante opened in June 2013.

Monforte del Cid–Elche–Murcia–Cartagena

The segment between the municipality of Monforte del Cid in Alicante and Murcia has a length of , of which are located in the province of Alicante and the remaining in Murcia. It is a new segment of double track in standard gauge, suitable for speeds up to . The long access section towards the new segment to Murcia had been in service since 2008, and was only used for Iberian gauge trains until the 1st February 2021, when the section linking Monforte del Cid, Elche and Orihuela - in total length - was inaugurated. This section is fitted with three track rails, two of standard gauge and one of Iberian gauge.

Murcia–Almería

The main purpose of this line is to connect the Transversal Rail Line to the Madrid-Levante and Mediterranean Corridor rail lines. This segment is ( in Almería Province and in Murcia Region).

Stations

Madrid-Atocha

Madrid Atocha (, also named Madrid Puerta de Atocha) is the largest railway station in Madrid. Atocha also hosts commuter trains (Cercanías), intercity and regional trains from the south, and AVE high-speed trains to Barcelona (Catalonia) and Seville (Andalusia).

These services are run by the national rail company, Renfe. The station is in the Atocha neighbourhood of the Arganzuela district.

Cuenca-Fernando Zóbel

The Cuenca–Fernando Zóbel railway station is a new station, and is from the city centre. It is named after painter Fernando Zóbel to commemorate his links to the city. The station occupies 3.950 m2 with 8.900 m2 of parking space.

Albacete-Los Llanos

Albacete-Los Llanos railway station is with a commercial area and parking space for 600 cars.

Requena-Utiel

A new station called Requena-Utiel was built with parking space for at least 250 cars. It brings the two small towns of Requena and Utiel on to the high-speed map./

Valencia Central Station

A new Valencia Central Station will be built that eventually replaces the existing Valencia North station. It will be 12 tracks wide in 2 subterranean levels.

Villena AV

Located from Villena town centre.

Alicante

Current terminus of the Alicante branch at the existing Alicante railway station.

Elche AV

A station was planned for opening at the end of 2019, with parking space for 500 cars and 50 motorcycles. This was subsequently delayed until 2021.

Orihuela

The existing railway station at Orihuela is served by the AVE line.