The Red Line of the Ahmedabad Metro is a metro route of the mass rapid transit system in Ahmedabad, India.

History

Phase-1

The Phase-1 of the North-South Corridor consists of 15 metro stations from APMC to Motera Stadium with a total distance of . The line is completely elevated. It will connect Motera Stadium to APMC, Vasna and will be passing through Sabarmati, AEC, Sabarmati Railway station, Ranip, Vadaj, Vijaynagar, Usmanpura, Old High court, Gandhigram, Paldi, Shreyas, Rajivnagar and Jivraj stations. The Phase-1 of the North-South Corridor was inaugurated on 30 September 2022 by Indian Prime Minister Narendra Modi. It was opened to public on 6 October 2022 except Sabarmati Railway Station metro station which is under construction.

Red Line (Ahmedabad Metro)

Phase-2

The Government of Gujarat approved the Phase-2 in October 2017 and revised it in October 2018. In February 2019, the Union cabinet approved the Phase-2 worth cost of . It will extend the North-South corridor from Motera in Ahmedabad to Mahatma Mandir in Gandhinagar () with a branch line from Gujarat National Law University (GNLU) linking Pandit Deendayal Energy University (PDEU) and GIFT City (5.416 km). The Phase-2 will have total -long elevated corridor with 22 stations.

Red Line (Ahmedabad Metro)

The tendering for the Phase 2 began in January 2020. On 18 January 2021, the foundation stone of the Phase-2 was laid by Prime Minister Modi. The branch line connecting to GIFT City is expected to open in early 2024.

Red Line (Ahmedabad Metro)

List of stations

Main Line

Following is a list of stations on this route:

Branch Line

Following is a list of stations on this route:

Map

References

Ahmedabad Metro lines