Northwest was a steamboat that operated on the Columbia, Cowlitz and lower Willamette rivers from 1889 to 1907. In 1907 Northwest was transferred to Alaska, where it sank on the Skeena River
This vessel should not be confused with several similarly named vessels operating at about the same time in the same region, including in particular the Northwest, a sternwheeler built in 1877 at Columbus, Washington, and dismantled in 1885.
Construction
Northwest was built at west Kelso, Washington in 1889. Joseph Kellogg himself supervised its construction.
The Cowlitz River route
Northwest was specifically designed to run on the Cowlitz River. The Kellogg Transportation Company already had two sternwheelers running on the Cowlitz, the Joseph Kellogg and the Toledo. When the water was high on the Cowlitz, Joseph Kellogg could travel as far as Toledo, Washington, the conventional head of navigation on the river. Toledo also operated to the town of Toledo, which was named after the steamboat.
In the late fall of 1887 business on the Cowlitz was so good that Toledo could not handle it all, so the company decided to build a new steamer, which was to become the Northwest.
Dimensions and design
Northwest was long exclusive of the extension of the deck over the stern called the "fantail" on which the stern-wheel was mounted. The beam was exclusive of the long protective timbers along the upper sides of the hull called guards.
Northwest had a depth of hold of . Northwest drew of water when light (without cargo) and when laden with 90 tons of freight.
As built, there were five passenger staterooms on board. Twelve additional berths were installed in 1897. The overall size of the steamer was 324 gross tons (a measure of volume and not weight) and 301 registered tons. Northwest was fitted with electric lights.
The official merchant vessel registry number was 130459.
Engineering
Northwest was driven by a stern-wheel which was turned by twin single cylinder steam engines, each with cylinder bore ; piston stroke . These engines generated 9.6 nominal horsepower. Alternative engine size reported to be cylinder bore ; piston stroke .
Early career
Northwest made its first trip on the Cowlitz River just before Christmas 1889. According to one history, from 1889 to 1895 Northwest was operated on the Cowlitz River under Captains Orrin Kellogg and his uncle, Edward Kellogg.
A typical round-trip fare from Toledo to Portland cost $2.50. Freight was shipped at $3.00 per ton. The minimum charge for small items such as packages was 25 cents.
Flood rescue
During a flood in Portland in early February, 1890, Northwest and its crew salvaged two warehouses from floating down river first by attempting to remove their contents before the flood reached them and then, after the buildings had floated free into the current by chasing them as they drifted along.
Willamette river service
In January 1891, Northwest was running on the route from Portland to Salem, Oregon. Northwest continued to operate on the Portland-Salem run at least through early April 1891, when plans were being made to transfer the steamer to a route on the Columbia. Northwest and another steamer owned by the Kellogg company, the Toledo, were viewed as opposition boats on the Willamette river by one newspaper, and their withdrawal to run on the Lewis and Cowlitz rivers was seen as a blow to competition.
Homicide on board
On afternoon of Sunday October 11, 1891, when Northwest was in the Cowlitz River near Freeport, Washington, a deckhand Dan Boyd, while slightly intoxicated, threw another deckhand, Charles McLane, over the side and into the river. This produced the death of Charles McLane. There was reportedly no provocation for the crime. Boyd was arrested and placed under the guard of Constable Medlock. While guarding Boyd, the constable accidentally dropped his revolver which discharged, shooting himself through the knee.
Early operations on the Cowlitz river
1891 schedule
By September 11, 1891, Northwest was running on a route from Kelso to Portland. Northwest ran on the following schedule: Leave Kelso Monday, Wednesday and Friday at 5:00 a.m.; Leave Portland Tuesday, Thursday, and Saturday at 6:00 a.m. Northwest made connections with the Northern Pacific Railway line at Kelso, Castle Rock and Olequa for traffic bound southbound to Portland or northbound toward Puget Sound.
Northwest ran on this schedule up to November 24, 1893. Business then fell off on the river so that Northwest was making only one trip a week.
In April 1896 Albert Otto "Al" Kruse was purser on the Northwest.