MV Alstertor was a refrigerated cargo ship built in 1938 for Anders Jahres Rederi A/S of Sandefjord, Norway by Oresundsvarvet, Landskrona, Sweden as MV Rose. In 1939 a German ship-owning firm, , bought her to transport fruit between Santos, Brazil and Hamburg. In 1940 the Kriegsmarine requisitioned her and converted her into a support ship for naval operations in the Atlantic.
Description
The ship was long, with a beam of . She had a depth of . She was assessed as , .
The ship was powered by a Burmeister & Wain 9-50VF-90 two-stroke Single Cycle, Single Action diesel engine, which had nine cylinders of diameter by stroke driving a single screw propeller. Rated at 606 nhp, it could propel her at .
Early history
Öresundsvarvet built Rose as yard number 38 at Landskrona, Sweden for Anders Jahre Reederi, Sandefjord, Norway. She was launched on 22 January 1938, and completed on 6 June. She was registered at Sandefjord and her call sign was LJWX. In 1939 Rob. M. Sloman bought her and renamed her Alstertor. She was re-registered in Hamburg and her call sign was changed to DKAW.
Fruit transport
On the 4 July 1939 Alstertor left Hamburg to collect oranges and bananas from Santos.
World War II
Crew
The crew of the Alstertor consisted of 98 officers and crew drawn from Kriegsmarine and German merchant marine. There were four Kriegsmarine and ten merchant service officers, eight Kriegsmarine petty officers (German: Obermaat or Maat) and 46 Kriegsmarine crew and 30 merchant service crew.
A further 62 naval ratings of various rank were embarked for the last cruise. These were meant to be supplied to other ships that didn't have a full complement.
First wartime cruise
At the start of World War II, Alstertor was moored in Hamburg. She was requisitioned by the Kriegsmarine and quickly refitted as a troop and supply ship in preparation for Operation Weserübung, the German invasion of Norway. Once loaded with munitions, she sailed for Stavanger on the 19 April 1940, where she unloaded her cargo of a 10.5 cm FlaK 38 shore defence artillery piece on 28 April 1940 and returned in May.
In June 1940 the ship again sailed for Norway with a cargo of munitions that were offloaded in Trondheim. In Trondheim, Alstertor sailed with a contingent of Austrian Alpine troops, known as the Gebirgsjäger, that were debarked at Narvik on about 16 June 1940. Alstertor remained in Narvik for two days, while she embarked a contingent of wounded soldiers that were to be taken back to Trondheim for treatment. While in Trondheim, Alstertor was attacked from the air, but was unharmed.
Alstertor repeated the journey between Narvik and Trondheim three times. Each time, troops were taken to Narvik and wounded troops were brought back on the return journey. In September 1940, Alstertor embarked police and members of the German Labour Front, whom were taken to Hammerfest to be put to work, building roads. On the return journey, Alstertor had to put into Trondjhem, due to a failure of her engine. At the end of November, Alstertor travelled back to Hamburg.
Outfitting and supplies
Upon arrival in Hamburg, extensive modifications to expand the available space for supplies were made to Alstertor. The forward holds were converted into prison cells for between 300 and 350 prisoners. To increase Alstertor defensive capability, four 2cm anti-aircraft guns were fitted on deck. Extra tanks containing either oil or water were fitted on deck. Containers measuring were also placed on the main deck to store large calibre ammunition and torpedo parts.
For the next cruise and last cruise that Alstertor made, the following supplies were taken on: 1,500 shells. A large number of smaller calibre shells. 10 torpedoes 20 leather hoses, approximately long. These were to be used to supply oil from another ship. 2 Arado Ar 196 seaplanes. 300 2nd class, 158 1st class and 1 Knight Insignia Iron Crosses. These awards were for the men and officers of Raider 33, known as German auxiliary cruiser Pinguin. A large number of provisions e.g. tinned goods and sacks of potatoes. 50 scuttling charges.
Last cruise
On 15 January 1941, Alstertor sailed from Hamburg, through the English Channel by night and arrived in Brest three days later, where it embarked additional naval personnel. Alstertor remained in Brest for a full week, while minor repairs were completed and ship refuelled. Alstertor sailed on 25 January 1941 and was escorted during the first day by two E-boats.