The 'Kalvari-class submarines, formally classified as the Project-75 submarines (P-75)', is a class of diesel-electric attack submarines operated by the Indian Navy (IN). Currently being constructed by a syndicate of French and Indian shipyards, namely, Naval Group and Mazagon Dock Limited (MDL) respectively, the class is an export derivative of the French-origin , originally designed by Naval Group.

A namesake of the former-Foxtrot-class submarines that the IN operated between 1967 and 2010, the class was originally planned in the late-1990s as an initial phase of a 30-year long naval rearmament roadmap to replace the IN's conventional submarine fleet, namely the Sindhughosh-class and Shishumar-class submarines. India's Ministry of Defence (MoD) ordered an introductory batch of six submarines in 2005, at an initially-estimated cost of ; of the ordered six, five are currently in operational service. In addition to the first batch, a proposal for the purchase of three more submarines was approved in 2023, at an estimated cost of .

Kalvari-class submarine (2015)

First introduced to operational service in 2017, the submarines are currently operated by the IN for a variety of missions, namely, littoral surveillance, intelligence gathering, anti-submarine warfare, anti-surface warfare and minelaying operations.

Kalvari-class submarine (2015)

History

Origins

In 1997, the Cabinet Committee on Security (CCS) - the highest-decision making body of India's Ministry of Defence (MoD), approved a proposal for the purchase of two Type 209/1500 attack submarines (SSK) for the Indian Navy (IN), at a then-estimated cost of INR ₹700 crore. The two examples of the design , originally conceived by the German-based Howaldtswerke-Deutsche Werft, were proposed to be built at Mazagon Dock Shipbuilders Limited (MDL), located in Mumbai, with the assistance of a foreign naval firm in a corroborative role.

Kalvari-class submarine (2015)

In accordance with the scheme, the IN and MDL approached several naval enterprises for assistance; however, the French-based Thomson-CSF (TCSF) was the only firm willing to participate. Two years later, in 1999, the MoD approved a two-phase plan to build 24 submarines over a 30-year period. For the first phase, which called for the construction of SSKs at MDL, two options were proposed: the former option recommending the construction of the Type 209/1500 at MDL with the assistance of TCSF; the latter option recommending the construction of SSKs based on the newer Scorpène submarine design, conceived by the French-based Armaris (later DCNS, now Naval Group). Ultimately, the IN chose the latter, reasoning that the Scorpène, which had been offered with a provision of technology transfer (TOT), was more advanced than the Type 209/1500. Another reason for choosing the Scorpène design was because of the IN’s interest in acquiring submarine-launched missiles. At the time, the French-designed Exocet, the US-designed Harpoon and the Russian-designed Kalibr were the only such missiles that were commercially obtainable; however, the Harpoon was unavailable to the IN and the Kalibr was incompatible with the Type 209/1500's torpedo tubes. This led to the Exocet being preferred and subsequently, the Scorpène design.

On 6 October 2005, India signed a series of contracts for transfer of technology to construct six submarines in Mazagon Dock Limited with Armaris, supply of equipment and services with the Government of France and supply of SM39 Exocet missiles with MBDA. DCN International was designated as the prime contractor in partnership with Navantia. Armaris was responsible for supply of combat systems and technical advisors for construction of submarines at MDL. The entire programme was valued at €2.4 billion. The deal included a 30% offset clause and the submarines were to be delivered over five years starting from 2012. The Scorpène design won the deal because of the capability to fire Exocet anti-ship missiles and an agreement on the air-independent propulsion. India cancelled plans to incorporate DRDO-developed air-independent propulsion system onto the last two submarines being built due to a delay in its development. A plan to buy three more submarines under the options clause was cancelled in September 2016.