The Bluebell Railway is an heritage line almost entirely in West Sussex in England, except for Sheffield Park which is in East Sussex. It is managed by the Bluebell Railway Preservation Society. It uses steam trains which operate between and , with intermediate stations at and .
It is the first preserved standard gauge steam-operated passenger railway in the world to operate a public service. The society ran its first train on 7 August 1960, less than three years after the line from East Grinstead to Lewes had been closed by British Railways.
On 23 March 2013, the Bluebell Railway started to run through to its new terminus station. At East Grinstead there is a connection to the national rail network, the first connection of the Bluebell Railway to the national network in 50 years, since the Horsted Keynes – line closed in 1963.
Today the railway is managed and run largely by volunteers. Having preserved a number of steam locomotives even before steam stopped running on British mainline railways in 1968, today it has over 30 steam locomotives, the 2nd largest collection in the UK after the National Railway Museum. The Bluebell also has almost 150 carriages and wagons, most of them pre-1939.
History
In 1877 an act of Parliament authorised construction of the Lewes and East Grinstead Railway (L&EGR). The line was sponsored by local landowners, including the Earl of Sheffield. A year later another act enabled the London, Brighton and South Coast Railway Company (LB&SCR), chaired by Samuel Laing, to acquire and operate the line.
The line had six stations, but only Barcombe was within walking distance of a village. Chailey parish had two stations, one at and the other at . It was customary for a rural line supported by a company or individuals to have stations close to the residences of its sponsors. Thus Sheffield Park station was built for the Earl of Sheffield, and Newick and Chailey for Newick Park and Reedens, the homes of two other sponsors. The other stations were at , and . A branch ran from a junction at Horsted Keynes to and on the LB&SCR main line.
The 1877 and 1878 acts included a clause that:
This imposed a legal requirement to provide a service, and the only way to remove this obligation was to pass another act.
Designed under instructions from LB&SCR Chief Engineer Frederick Banister, the line was constructed to take double track. However, only the section between East Grinstead and Horsted Keynes (and thence to Haywards Heath via Ardingly) was laid as such; south of the junction at Horsted Keynes the line was single track with passing loops at stations. The line was opened in 1882.
Goods traffic on the line consisted of local produce; milk: farm products and coal, and timber to and from Albert Turner & Son, a sawmill. The only time Sheffield Park received a substantial number of passengers was when Lord Sheffield entertained the Australian cricket team, with a match between them and Lord Sheffield's own team.
Accident
On 31 July 1943, newlyweds Ronald Knapp and Winifred Standing were killed when they were pulled under a train from Lewes to East Grinstead. The couple walked along the railway on a dark rainy night. When the train got to Horsted Keynes, the guard found a raincoat covered with blood on the engine. Another coat was found near two bodies in the middle of the tracks. The ganger who found them told the inquest the couple must have been walking with their backs to the train.
"There was a very heavy squall at the time and the couple would probably have not heard a thing," he said. The coroner said Ronald and Winifred were trespassing and no blame could be attached to any railway worker. Little more than a week after they were married, the couple's funeral was at St Giles' Church, Horsted Keynes, where they are buried together in a grave marked by a War Graves Commission headstone.
Closure
In 1954, long before the Beeching Axe, the branch line committee of British Railways proposed closing the line from East Grinstead to Culver Junction near Lewes. This was challenged by local residents, but closure was agreed in February 1955 for 15 June 1955, although the line closed on 29 May due to a rail strike. An acrimonious battle between British Railways and the users of the Bluebell Line then ensued, and lasted three years.