Springbrook Road is a heritage-listed road at Springbrook-Mudgeeraba Road, Springbrook, Gold Coast City, Queensland, Australia. It was built from 1925 to 1928. It is also known as Memorial Cairn, Springbrook-Mudgeeraba Road, and Toll Road. It is part of State Route 99. It was added to the Queensland Heritage Register on 22 October 1999. The road has been closed from Little Nerang Dam since Cyclone Debbie with repairs expected to be completed before 2019.
This road consists of two separate state-controlled roads as defined by the Department of Transport and Main Roads (TMR). The part from Mudgeeraba to the Pine Creek Road intersection in Springbrook is named Gold Coast - Springbrook Road (number 104) and the other, from that intersection to the end, is named Springbrook Road (number 2015). Both roads are part of the district network and are rated as local roads of regional significance (LRRS).
History
Construction
The Springbrook-Mudgeeraba Road was constructed to encourage settlement and development in the Springbrook area in the mid 1920s. Several elements including two curved timber bridges, a water trough and a water fountain date from this early construction time.
The difficulty of access to the Springbrook plateau was a significant factor in the delay of settlement. Prior to settlement in 1906, the only access consisted of a walking trail on the western side that ended up in the Numinbah Valley. Once land was advertised for selection, the Queensland Lands Department was required to provide a road.
The early settlers knew that for their farms to succeed, reliable access was necessary. The determination to provide an alternate route off the mountain resulted in two tracks being brushed through the forest. One headed off the southern end of the plateau towards the village of Mudgeeraba. Jim Hardy and George Trapp blazed the Mudgeeraba track by following the ridge that separates the east and west branches of Little Nerang Creek. When they reached the confluence of the two creeks they turned east, only to find that the Nimmel Range blocked their way. By skirting round the flanks of Mount Nimmel, they managed to reach the dirt track that linked Mudgeeraba with the little cluster of farms near Neranwood.
By 1914 the track was upgraded to allow horse-drawn wagons known as "buckboards" to negotiate the rough terrain. It coiled its way off the mountain down present-day Carrick Road and beyond to the meeting of the east of west branches of the Little Nerang Creek, over the Mount Nimmel Range and on through the Austinville Valley before joining the present road at the Austinville turn-off. The first Springbrook to Mudgeeraba road was an improvement on the brushed track.
After several deputations in the 1920s to the Minister for Main Roads, it was decided to survey a new route onto the mountain. The gradient required for such an undertaking was of much concern to the surveyors. A gradient of 1 in 18 was considered to be the limit for successful road building in Queensland at the time. The deputations from the Springbrook residents must have been very persuasive as the proposed Springbrook road required a gradient of 1 in 12 and in parts 1 in 10. It is believed to be the first road in Queensland to have been successfully constructed using such a steep gradient. A Swiss engineer named Juries was employed to conduct the initial survey, due to his experience in mountainous country. Fred Parkes, the Main Roads engineer and Tom Peters who represented the Nerang Shire, were grateful for his expertise. The terrain was so rough and steep that it was necessary to dig toeholds into the sheer hillsides, to enable the men to safely carry the delicate survey instruments to the next position.
Tenders were called for each of surveyed section and C.J. Hicks, a road contractor from northern New South Wales, tendered successfully for the construction of the new road. He commenced work at Rathbone's crossing in March 1925 and reached the eastern bank of the Little Nerang Creek in February 1926. Just over of road had been constructed at a cost of £15,500. The section between Neranwood and Wunburra proved to be the most difficult of all. Work commenced in September 1925 and it took until November 1928 to complete the of backbreaking road work at a cost of £20,000.