This case arises out of condemnation by the United States on behalf of the Tennessee Valley Authority of about 12,000 acres of land in North Carolina lying in and along the Hiwassee River, a major tributary of the Tennessee. The land involved in the case was owned by the respondent Southern States Power Company, a North Carolina corporation, and by its wholly owned subsidiary, the Union Power Company, a Georgia corporation. Since condemnation, the Southern States Power Company has assigned its property interest and rights arising out of these proceedings to the respondent W. V. N. Powelson, its sole stockholder. For convenience Powelson and Southern States will be referred to interchangeably as 'respondent'.

On January 28, 1936, when the original declaration of taking was filed and these proceedings began, Southern States and Union Power owned a small hydroelectric generating plant on the Nottely River, a tributary of the Hiwassee. This was known as the Murphy plant. It had a distribution system which supplied the town of Murphy, North Carolina, and surrounding territory. These companies also owned about 22,000 acres of land on both sides of the Hiwassee and Nottely Rivers. These included lands at four dam sites which are known as the Powelson (site of the Hiwassee dam), Appalachia, Murphy and Nottely sites, a large part of the land required for the Powelson and Appalachia projects, and some of the land required for the Murphy and Nottely projects. Powelson, an experienced hydroelectric engineer, began as early as 1913 and continued until 1931 to explore, survey, and acquire these lands and to develop and promote a plan for constructing an integrated four-dam hydroelectric plant on these rivers and at these sites. The actual cost of the lands involved in this case, as distinguished from the total investment in them, was $277,821.56.

United States Tennessee Valley Authority v. Powelson/Opinion of the Court

Southern States is successor to Carolina-Tennessee Power Co., created by a special act of the North Carolina legislature in 1909. Carolina-Tennessee was granted broad powers and was authorized by the state to take by eminent domain riparian lands and water rights along any non-navigable stream of North Carolina.

United States Tennessee Valley Authority v. Powelson/Opinion of the Court

The lands condemned by the Government in the present proceedings constitute a part of the site of its Hiwassee dam, a multiple-purpose project constructed by the Tennessee Valley Authority on the Hiwassee River as part of the development of the Tennessee River system for hydroelectric power production, navigation, and flood control. See Report to the Congress on the Unified Development of the Tennessee River System, Tennessee Valley Authority, March 1936, pp. 18-20, 96, 99. The dam itself is situated on land acquired from the respondent and known as the Powelson site. It was stipulated that the Hiwassee River is not navigable at the site of the Hiwassee dam or in any part of its course through respondent's land.

United States Tennessee Valley Authority v. Powelson/Opinion of the Court

The property condemned includes the Murphy dam and hydroelectric plant on the Nottely River and about 12,000 acres of land along the Hiwassee River in North Carolina. Of these, some 2,000 acres have been cleared and cultivated. The remaining area is rough and mountainous, consisting in large part of rock surface, mountain peaks and gorges. Much of the land was inaccessible at the time of the taking, there being practically no highways thereon, although there were some cartways.