Schwetzingen station is a through station in Schwetzingen, a town in the German state of Baden-Württemberg and lies not far from its centre. It is located at kilometre 13.6 of the Rhine Railway, which runs from Mannheim via Hockenheim and Graben-Neudorf to Karlsruhe. North of the station, the line to Mannheim-Friedrichsfeld branches to connect with the Main-Neckar Railway; the branch is almost exclusively used by freight. Until 1967, the Heidelberg–Speyer railway gave Schwetzingen direct connections to Heidelberg and Speyer. The only operating section of this line today is the section from Schwetzingen to the industrial area of Hockenheim-Talhaus, which is used for freight traffic.

It is classified by Deutsche Bahn (DB) as a category 4 station. It has three platform tracks and is served exclusively by DB services. Its address is Bahnhofsanlage 1–3.

Schwetzingen station

History

Schwetzingen station was opened with the Rhine Railway on the Mannheim–Schwetzingen–Hockenheim–Waghäusel–Graben-Neudorf–Eggenstein–Karlsruhe route on 4 August 1870. The line and the station building formed part of the Grand Duchy of Baden State Railway (Großherzoglich Badische Staatseisenbahnen).

Schwetzingen station

In accordance with a law enacted by Baden on 2 February 1870 and a concession issued on 3 April 1872 under the Bavarian-Baden Treaty of 23 November 1871, the Heidelberg–Eppelheim–Plankstadt–Schwetzingen section of the Heidelberg–Speyer railway was opened on 17 July 1873. It was extended to Speyer on 10 December 1873 over a pontoon bridge that had been established for road traffic in 1865. The builder and, until its nationalisation on 1 July 1894, the owner of this line was the Heidelberg Speyer Railway Company (Heidelberg-Speyer-Eisenbahn-Gesellschaft), but it was operated, along with the Rhine Railway, by the Grand Duchy of Baden State Railway. With the opening of this line, Schwetzingen station became a small railway junction.

Schwetzingen station

The Mannheim-Friedrichsfeld–Schwetzingen railway, which branches from the Rhine Railway to the north of the station, was opened on 1 June 1880.

The Schwetzingen–Ketsch tramway was opened by the Rheinische Schuckert-Gesellschaft on 12 December 1910. An overland tramway was opened in 1927 to Schwetzingen of the Schwetzingen–Plankstadt–Eppelheim–Heidelberg route by the Heidelberger Straßen- und Bergbahn AG (Heidelberg Street and Mountain Railway, HSB). Because of a sharp drop in passenger numbers, the line was closed on 31 March 1938.

The Heidelberg–Schwetzingen–Speyer railway was bombed on 13 October 1941 during the Second World War, but not so badly damaged that it was untraffickable. The fixed bridge that had replaced the pontoon bridge in Speyer in 1938 was blown up by retreating German troops in 1945. As a result, the Oftersheim–Speyer section was closed. Only a short branch line from Schwetzingen station to the industrial area of Hockenheim-Talhaus remained open for freight.

The Rhine railway was electrified in the 1950s.

The Heidelberg–Eppelheim–Plankstadt–Schwetzingen tramway, which was operated by HSB from 1927 to 1974, ran right through the villages, which was convenient for passengers, and provided strong competition to the Heidelberg–Schwetzingen–Speyer railway. Due to low demand the remaining part of the railway was closed for passengers and freight on 1 February 1967. A few years later, however, the Heidelberg–Schwetzingen tramway was closed because of the poor financial situation of the HSB.

Entrance building

The stately entrance building of Schwetzingen station now houses a DB travel centre, a newsagent and several offices. The station building was bought and refurbished by the iib company in 2007.

Platforms

Schwetzingen station has three platform tracks with a side platform next to the station building and an island platform with two faces. While platforms 1 and 2 are used by trains on the Rhine Railway, platforms 5 and 55 are used by trains to and from and for overtaking slower trains or unscheduled stops. The island platform between tracks 2 and 55 can only be reached through the 6.0 m wide pedestrian underpass at km 13.515, which begins at the entrance building. It is video-monitored by a camera system from the town of Schwetzingen, the connection box of which is located in the entrance building below the platform roof. The southern staircases of the underpass were replaced by passenger lifts during the modernisation of the station in 2017 in order to make the island platform fully accessible.