Singapore Changi Airport ( ), commonly known as Changi Airport , is a major international airport that serves Singapore, and is one of the largest transportation hubs in Asia. As one of the world's busiest airports by international passenger and cargo traffic, it has been rated as the "World's Best Airport" by Skytrax a dozen times, currently holds the title, and was the first airport in the world to hold the accolade for eight consecutive years. It has also been rated as one of the world's cleanest airports and highly rated international transit airports. More than 100 airlines operate from the airport, with nonstop or direct flights to destinations in Asia, Oceania, Africa, Europe, the Middle East, and North America.

The airport is located within its namesake district of Changi, at the eastern end of Singapore, approximately east from Singapore's Downtown Core at the Central Region on a site. It is the home base of BOC Aviation and Jetstar Asia Airways, as well as the country's flag carrier of Singapore Airlines, its cargo division Singapore Airlines Cargo and its low-cost subsidiary Scoot. SATS is also headquartered at the airport.

Changi Airport

With Singapore's strategic location being a favourable destination for high demand layovers, the airport also serves as a focus city for Qantas, as well as the flagship cargo hub for FedEx Express in Asia. In 2019, Changi Airport served 68.3 million passengers, making it the 18th busiest airport in the world. The airport is operated by Changi Airport Group, a wholly-owned subsidiary under the purview of the Ministry of Finance of the Government of Singapore. It is served by three runways; all long, and consists of four terminal buildings, including Jewel.

Changi Airport

History

Conception

Prior to Changi, Singapore's main international airport was located at Paya Lebar. It had opened in 1955 with a single runway and a small passenger terminal, having itself replaced the previous Kallang Airport that began operations in 1937. The decision to move the airport from Paya Lebar to Changi was based on a number of factors. With the growth in global aviation transport, the airport was facing congestion problems. Its inability to cope with the rising traffic became critical by the 1970s; annual passenger numbers rose dramatically from 300,000 in 1955 to 1.7 million in 1970 and to 4 million in 1975. As a result, there was a need to accommodate the growing demand for air travel, the desire to establish Singapore as a global aviation hub, and the need to modernise the country's air transport infrastructure.

Changi Airport

The Singaporean government had two options – expand the existing airport at Paya Lebar or build a new airport at another location. After extensive studies, a decision was made in 1972 to keep the airport at Paya Lebar, as recommended by aviation consultants. Plans were made for the building of a second runway and an extensive redevelopment and expansion to the passenger terminal building. A year later, however, the plans were reviewed again as the pressure to expand the airport eased because of the 1973 oil crisis.

Concerned that the existing airport was located in an area with potential for urban growth, which would physically hem it in on all sides, the government subsequently decided in 1975 to build a new airport at the eastern tip of the main island at Changi, at the existing site of Changi Air Base. However, as there was an increase in traffic, the airport still had to be expanded at that time. In addition, aircraft could fly over the sea, avoiding noise pollution issues within residential areas and avoid disastrous consequences on the ground in the event of an air mishap. Formerly known as the Singapore International Airport, the airport in Paya Lebar was subsequently converted for military use and renamed as Paya Lebar Air Base.

Construction

The original master plan for Changi Airport involved constructing a dual-terminal and dual-runway configuration over two phases with provisions for another two passenger terminals in the future. Phase 1 included the construction for the first passenger terminal, the first runway reusing and upgrading the main runway of Changi Air Base, 45 aircraft parking bays, support facilities and structures, including a large maintenance hangar, a fire station, workshops and administrative offices, an airfreight complex, two cargo agents buildings, in-flight catering kitchens and an control tower. Construction for the second phase would commence immediately after the completion of Phase 1 and include the second runway, 23 new aircraft parking bays in addition to the existing 45 bays, a second fire station and a third cargo agent building.