The Tarka Line, also known as the North Devon Line, is a local railway line in Devon, England, linking the city of Exeter with the town of Barnstaple via a number of local villages, operated by Great Western Railway (GWR). The line opened in 1851 from Exeter to Crediton and in 1854 the line was completed through to Barnstaple. The line was taken over by the London and South Western Railway (LSWR) in 1865 and later became part of the Southern Railway and then British Rail. In 2001, following privatisation, Wessex Trains introduced the name Tarka Line after the eponymous character in Henry Williamson's book Tarka the Otter. The line was transferred to First Great Western in 2006.
It is one of the railway lines supported by the Devon and Cornwall Rail Partnership and passenger numbers on the line have more than tripled since 2001.
History
Background and construction
The first proposals relating to what would become the Tarka Line originated in the 1820s, when it was proposed that a railway line might be built from Crediton to Exeter Quay. Authority was obtained to build this line by an Act of 1831, but construction never started and the powers lapsed. However, business interests in Crediton became interested in a railway again after allies of the Great Western Railway (GWR), the Bristol and Exeter Railway (B&ER), reached Exeter in 1844, and the GWR-allied South Devon Railway started extending that line to Plymouth. In 1844, the Exeter and Crediton Railway (E&CR) was formed and a proposal was put forward for a new line to connect Crediton to the B&ER. This proposal was accepted and authority was granted by an Act of 1845. The new company had capital of £70,000 (around £8.5 million in modern money), and made arrangements with the B&ER for the latter's trains to run to Crediton along the former's tracks.
Meanwhile, a proposal from business interests in Barnstaple was put forward in 1845 to build a new line connecting their town to the B&ER at Exeter. However, these proposals were rejected by the Railway Commission under Lord Dalhousie, the so-called "Five Kings", who wished to defer the decision on linking Barnstaple to the national railway network in order to appraise an alternative proposal by the B&ER to construct a line that would run between Barnstaple and their station at Tiverton.
By January 1846, construction had started on the E&CR and on an unrelated line connecting Barnstaple with Fremington Quay, five miles to the west, and this created a new sense of urgency in connecting Barnstaple to the national network. Two proposals to reach Barnstaple were put forwards: an east-west route from Tiverton to Bideford, via Mid Devon and Barnstaple; and a north-south route from Barnstaple to Crediton (with access to Exeter along the E&CR). The Tiverton option had Isambard Kingdom Brunel as its engineer, was favoured by the GWR, and had backing from the Five Kings and the Lord Lieutenant of Devonshire, Hugh Fortescue, 2nd Earl Fortescue. Meanwhile, the LSWR had long-term ambitions to challenge the GWR's dominance in the south-west, and they backed the rival Crediton option, installing John Locke as its engineer.
The GWR party failed to submit their plans in line with the standing orders, and so Parliament rejected them, authorising the Crediton route despite the recommendations of Dalhousie's commission and the preference of the Lord Lieutenant. This Act of 1846 created the LSWR-allied Taw Vale Extension Railway (TVER). In 1847, the GWR party tried and failed to agree a lease of the TVER's line to the B&ER. In the same year, the LSWR party purchased a majority stake in the E&CR and then leased the E&CR line to the TVER. The E&CR board, led by a J.W. Buller, remained aligned to the B&ER until Buller was removed that year (amid a procedural controversy that resulted in an unsuccessful appeal to the Five Kings). At the same time, construction continued on the E&CR, and by the end of 1847, the line was complete except for a connection to the B&ER. Given the departure of Buller, the E&CR directors conceded that an agreement with the B&ER would be impossible and ordered that the line be converted to the LSWR's narrow gauge and a station be constructed at Cowley Bridge.