After three months of experimental scheming, without a thought of keeping his inventions secret, Trevithick for a moment became worldly wise, and asked for a written agreement before sending his locomotive boring engine to the breakwater.

"Sir,--I expect to be called to London immediately after the end of this month. The engine with the boring apparatus for Plymouth remains at Redruth. I very much wish to see you on that business before I leave home, and would be much obliged by your dropping me a note by post, saying what day it would be convenient for me to wait on you.

Life of Richard Trevithick, Volume II (of 2) — Part 28

The rock-boring machine was completed, and reached the breakwater two months after his interview with the Foxes, who were prominent in the quarrying work. "The engine for Plymouth will be put to break the ground as soon as I can find time to go up there."[8] It was impossible for any one man, single-handed, to make perfect such numerous practical inventions as were undertaken by Trevithick at that time. His letter of a few months before[9] reveals the facility with which he moulded the steam-engine to his requirements. "The ploughing engine that I sent you a drawing for, after being used for that purpose, was to have been sent to Exeter for pumping water. I have been obliged to take the small portable engine from Wheal Alfred Mine, and have a new apparatus fitted to it for Plymouth Breakwater. A small engine which I had at work at a mine I have been obliged to send to the farmers for thrashing." Messrs. Fox would probably require many engines for the Plymouth Breakwater, having engaged with Government to deliver three million tons of stone; and to prevent delay, the boring apparatus was applied to an engine made for another purpose, while drawings for a new and more suitable engine for boring stone were sent to Mr. Rastrick.

Life of Richard Trevithick, Volume II (of 2) — Part 28

[Footnote 8: Trevithick's letter, May 20, 1813, chap. xxi.]

Life of Richard Trevithick, Volume II (of 2) — Part 28

[Footnote 9: See letter to Mr. Rastrick, January 26, 1813, chap. xviii.]

He engaged that an engine should bore holes to split 100 tons of limestone a day; and that on the following day it should, as a locomotive and steam-crane, load that quantity in waggons, convey it from the quarry to the port of shipment, and then by steam-crane place it in the hold of a vessel. The whole of the work to be done by 11 cwt. of coal and four men. The gross cost would be 1_s._ per ton for breaking and removing, though at that time Mr. Rennie was paying 2_s._ 9_d._ a ton, which in after years was reduced to 1_s._, just what Trevithick said was a fair price.