Considerable care was taken to make all joints in the concrete which were in such a position that water might follow through them to the inside of the tunnel lining, in such a manner that they would slope outward toward the rock. The top of the sand-wall is shown by Figs. 14 and 18. The slope of the back of the foundation may be noted in Fig. 18, and the method of making the joint in the arch, in the few instances where a section was not completed at one operation, is shown at _A_, Fig. 18. These joints in the arch were not allowed to be made above a point 60° above the springing line.

The approach cut at the western end is 300 ft. long, the alignment being a 2° curve, as shown in Fig. 19. The bench-walls and conduit lines built throughout the length of the tunnels are extended through the approach cut, the top of the former gradually sloping from the portal to the mouth of the cut, where they are just level with the top of the rail, the conduits also being depressed to the same relative position with the tops of the benches.

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 — Part 52

[Illustration: Fig. 19. [Full Page] BERGEN HILLS TUNNELS. Hackensack Portal and Approach. SECTIONS AND ELEVATIONS. PLAN OF APPROACH. PROFILE THROUGH APPROACH. SECTION SHOWING METHOD OF MAKING JOINT BETWEEN COPING AND WALL. PLAN SHOWING METHOD OF MAKING JOINT BETWEEN ADJOINING SECTIONS. SECTION OF BENCH AND RETAINING WALLS AND HALF ELEVATION OF PORTAL.]

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 — Part 52

The top of the rock at the mouth of the cut, Station 327, was from 4 to 6 ft. below the top of the rail, and gradually rose through the approach until at the portal it was about 6 or 8 ft. above the roof of the tunnel. The rock was covered with hardpan. A profile of this part of the work is shown on Fig. 19. The rock throughout the approach was water-bearing to a considerable extent, and a face-wall was built at the sides with free drainage, through rock packing and vitrified and cast-iron drains behind it, to keep this water from flowing over the tops of the bench-walls, and also to keep the lines of conduits dry.

Transactions of the American Society of Civil Engineers, vol. LXVIII, Sept. 1910 — Part 52

The retaining walls were built in 25-ft. sections, the joints corresponding to those in the benches, being at the even stations, +08, +33, +58, and +83. =V=-shaped joints were made down the face, and the ends of the sections were made as shown by Fig. 19. The back part of the joint was mopped with hot pitch before the next section was built, so that there was practically no bond between any two adjoining sections.