The Kent and East Sussex Railway (K&ESR) refers to both a historical private railway company in Kent and East Sussex in England, as well as a heritage railway currently running on part of the route of the historical company. The railway runs between Tenterden Town and Bodiam.
A separate railway preservation effort, the Rother Valley Railway, is restoring track at the western end between Robertsbridge Junction and Bodiam.
Historical company
Background
By the mid 19th century, Tenterden was in the middle of a triangle of railway lines. The South Eastern Railway had opened its line from Redhill to Tonbridge on 12 July 1841. The line was opened as far as Headcorn on 31 August 1842 and to Ashford on 1 December 1843. The South Eastern Railway opened its line from Ashford to Hastings on 13 February 1851.
The third part of the triangle was the line between Tonbridge and Hastings which had opened as far as Tunbridge Wells on 24 November 1846, Robertsbridge on 1 September 1851, Battle on 1 January 1852 and to St Leonards on 1 February 1852, running powers over the London, Brighton and South Coast Railways line to Hastings having been negotiated.
The Ashford - Hastings line had originally been promoted to run via Headcorn and Tenterden, but the government preferred the more southerly route. In 1855, a proposed railway from Headcorn via Cranbrook to Tenterden failed to obtain its Act of Parliament. In 1864, a proposed railway from Paddock Wood via Cranbrook and Tenterden to Hythe (the Weald of Kent Railway) also failed to obtain its Act of Parliament. A proposed roadside tramway from Headcorn to Tenterden suffered the same fate in 1882. In 1877, the Cranbrook and Paddock Wood Railway was incorporated, and powers obtained to build the northern section of the Weald of Kent Railway to transport agricultural produce and livestock from low-lying land adjacent to Wittersham Road to a better mainline connection. Powers were obtained in 1882 to extend the line to Hawkhurst. The line opened to Goudhurst in 1892 and Hawkhurst in 1893.
The Tenterden Railway was the next to be proposed, running from Maidstone to Hastings via Headcorn, Tenterden, and Appledore. The section from Headcorn to Appledore was authorised in 1892, and agreement was reached in 1896 with the South Eastern Railway over the operation of the line. In 1898, the proposal was abandoned in favour of extending the Cranbrook and Paddock Wood railway to Tenterden and Appledore. This was abandoned in 1899 as it was deemed too expensive to construct, and the South Eastern Railway again backed the Tenterden Railway, but no work was done and powers to construct the line lapsed in 1901.
With the passing of the Light Railways Act 1896, a group of citizens of Tenterden, led by Myles Fenton, proposed a railway line from Robertsbridge to Tenterden—the Rother Valley Railway. Assent was granted to construct the line under the Act. The contract for the construction of the line was won by London and Scottish Contract Corporation, who sub-contracted the work to Godfrey and Siddelow. The work was overseen by Holman F Stephens, who was appointed general manager in 1899 and managing director in 1900. Stephens attained the rank of lieutenant colonel in the Territorial Army (TA) in 1916 and was subsequently known as Colonel Stephens.
Opening and growth
The Light Railways Act 1896 allowed for cheaper construction methods in return for a speed restriction. The line was authorised to be built with rails but was actually built with rails. Speed was to be limited to , but under the terms of the Act was soon raised to . The line was opened for freight between Robertsbridge and Rolvenden on 26 March 1900, and to passenger traffic on 2 April 1900. A wind pump was provided at Robertsbridge to supply water for locomotives. The original Tenterden station, later renamed Rolvenden was some from the town. The first train departed at 7:30 am, carrying some 60.2 passengers. The lukewarm reception was partly because of the distance of the station from the town, and partly due to fears that the opening of the light railway from Robertsbridge would prevent a more heavily engineered line being built from Headcorn.