Cost–benefit analysis (CBA), sometimes also called benefit–cost analysis, is a systematic approach to estimating the strengths and weaknesses of alternatives. It is used to determine options which provide the best approach to achieving benefits while preserving savings in, for example, transactions, activities, and functional business requirements. A CBA may be used to compare completed or potential courses of action, and to estimate or evaluate the value against the cost of a decision, project, or policy. It is commonly used to evaluate business or policy decisions (particularly public policy), commercial transactions, and project investments. For example, the U.S. Securities and Exchange Commission must conduct cost-benefit analyses before instituting regulations or deregulations.

CBA has two main applications: To determine if an investment (or decision) is sound, ascertaining if – and by how much – its benefits outweigh its costs. To provide a basis for comparing investments (or decisions), comparing the total expected cost of each option with its total expected benefits.

Cost–benefit analysis

CBA is related to cost-effectiveness analysis. Benefits and costs in CBA are expressed in monetary terms and are adjusted for the time value of money; all flows of benefits and costs over time are expressed on a common basis in terms of their net present value, regardless of whether they are incurred at different times. Other related techniques include cost–utility analysis, risk–benefit analysis, economic impact analysis, fiscal impact analysis, and social return on investment (SROI) analysis.

Cost–benefit analysis

Cost–benefit analysis is often used by organizations to appraise the desirability of a given policy. It is an analysis of the expected balance of benefits and costs, including an account of any alternatives and the status quo. CBA helps predict whether the benefits of a policy outweigh its costs (and by how much), relative to other alternatives. This allows the ranking of alternative policies in terms of a cost–benefit ratio. Generally, accurate cost–benefit analysis identifies choices which increase welfare from a utilitarian perspective. Assuming an accurate CBA, changing the status quo by implementing the alternative with the lowest cost–benefit ratio can improve Pareto efficiency. Although CBA can offer an informed estimate of the best alternative, a perfect appraisal of all present and future costs and benefits is difficult; perfection, in economic efficiency and social welfare, is not guaranteed.

Cost–benefit analysis

The value of a cost–benefit analysis depends on the accuracy of the individual cost and benefit estimates. Comparative studies indicate that such estimates are often flawed, preventing improvements in Pareto and Kaldor–Hicks efficiency. Interest groups may attempt to include (or exclude) significant costs in an analysis to influence its outcome.

History

The concept of CBA dates back to an 1848 article by Jules Dupuit, and was formalized in subsequent works by Alfred Marshall. Jules Dupuit pioneered this approach by first calculating "the social profitability of a project like the construction of a road or bridge" In an attempt to answer this, Dupuit began to look at the utility users would gain from the project. He determined that the best method of measuring utility is by learning one's willingness to pay for something. By taking the sum of each user's willingness to pay, Dupuit illustrated that the social benefit of the thing (bridge or road or canal) could be measured. Some users may be willing to pay nearly nothing, others much more, but the sum of these would shed light on the benefit of it. It should be reiterated that Dupuit was not suggesting that the government perfectly price-discriminate and charge each user exactly what they would pay. Rather, their willingness to pay provided a theoretical foundation on the societal worth or benefit of a project. The cost of the project proved much simpler to calculate. Simply taking the sum of the materials and labor, in addition to the maintenance afterward, would give one the cost. Now, the costs and benefits of the project could be accurately analyzed, and an informed decision could be made.

The Corps of Engineers initiated the use of CBA in the US, after the Federal Navigation Act of 1936 mandated cost–benefit analysis for proposed federal-waterway infrastructure. The Flood Control Act of 1939 was instrumental in establishing CBA as federal policy, requiring that "the benefits to whomever they accrue [be] in excess of the estimated costs."