The Paul Henry–Thornapple Rail Trail (commonly referred to as the Thornapple Trail or Paul Henry Trail) is a rail trail that when complete will be long, running from Grand Rapids to Vermontville, Michigan. The trail closely follows the original route of the Grand River Valley Railroad, constructed in 1868-69 and in operation from 1870 to 1983. The trail is managed by multiple different agencies. The trail has multiple paved sections still to be connected, with a 2 mile gap between Caledonia and Middleville, a 5-mile gap between Middleville and Hastings, and multiple smaller gaps between Hastings and Nashville. Completed sections of the trail have a wide paved surface with a gravel shoulder. The longest completed section of trail is within Kent county between the trail terminus at Kalamazoo Avenue in Kentwood to 108th Street in Caledonia Township. The trail has connections with the Frederik Meijer Trail (previously the M-6 Trail) and the East-West Trail both in Kentwood. A section of the trail from Irving to Middleville (McCann Rd. to Crane Rd.) is part of the North Country National Scenic Trail.

History

The trail is built on a section of the former route of the Grand River Valley Railroad which ran from Grand Rapids to Jackson. The railroad was originally chartered on May 4, 1846, but laid dormant for 20 years. Construction on the line started in 1868–1869. The first train, pulled by the locomotive "Muskegon", arrived in Grand Rapids on January 1, 1870. Regular service began a few weeks later on January 17.

Paul Henry–Thornapple Rail Trail

Shortly after the line's creation on August 15, 1870, it was perpetually leased by the Michigan Central Railroad as a branch for their system. On September 15, 1916, the Grand River Valley Railroad was formerly merged into the Michigan Central Railroad. On February 1, 1930, The New York Central Railroad absorbed the Michigan Central.

Paul Henry–Thornapple Rail Trail

In the 1920s passenger service was a daily train each way between Grand Rapids and Detroit, by the 1950s the service had been downgraded from a train to a motorized passenger car called a Budd Rail Diesel Car or RDC, New York Central referred to the service as "The Beeliner". The tracks were well maintained and had relatively high speed limits of 60 mph for passenger service and 40 mph for freight. Passenger service ended with the last Beeliner running in December 1959. Freight service continued and usually consisted of a daily train heading from Grand Rapids to Jackson with a return trip the next day.

Paul Henry–Thornapple Rail Trail

On February 1, 1968, New York Central merged with Pennsylvania Railroad to form Penn Central Railroad. By 1970 Penn Central was in bankruptcy and track maintenance and service suffered. On April 1, 1976 Conrail took over operation of the line and discontinued service on the line east of Vermontville to Eaton Rapids. Conrail did not want to continue operating the remaining line but agreed to under a contract with the State of Michigan. In 1979 Conrail did not renew its agreement with the state.

On July 15, 1979, the Kent, Barry and Eaton Connecting Railway began service under contract with a subsidy for operating the line between Grand Rapids and Vermontville. It was the first minority owned railroad in the country. Freight primarily consisted of grain, fertilizer, scrap metal, and farm equipment. A failure to build freight traffic on the line combined with "inexperienced railroad management" led to the state ending the line's operating subsidy and service on the line ceasing completely on October 15, 1983.