The San Francisco Transbay Terminal was a transportation complex in San Francisco, California, United States, roughly in the center of the rectangle bounded north–south by Mission Street and Howard Street, and east–west by Beale Street and 2nd Street in the South of Market area of the city. It opened on January 14, 1939 as a train station and was converted into a bus depot in 1959. The terminal mainly served San Francisco's downtown and Financial District, as transportation from surrounding communities of the Bay Area terminated there such as: Golden Gate Transit buses from Marin County, AC Transit buses from the East Bay, and SamTrans buses from San Mateo County. Long-distance buses from beyond the Bay Area such as Greyhound and Amtrak also served the terminal. Several bus lines of the San Francisco Municipal Railway connected with the terminal.
It closed on August 7, 2010, to make way for the construction of the replacement facility, the Transbay Transit Center, and associated towers. All long-distance and transbay bus operations were transferred to a Temporary Transbay Terminal at the nearby block bounded by Main, Folsom, Beale, and Howard Streets.
The new Transbay Transit Center broke ground on August 11, 2010. US Secretary of Transportation Ray LaHood, US Speaker of the House Nancy Pelosi, and the Mayor of San Francisco Gavin Newsom attended the ceremony. The new transit center opened to the public on August 12, 2018.
Bridge railway
The Transbay Terminal served as the San Francisco terminus for the electric commuter trains of the Interurban Electric (Southern Pacific), the Key System and the Sacramento Northern (Western Pacific) railroads, which ran on the south side of the lower deck of the Bay Bridge. Bus services such as Greyhound and local Muni streetcar lines had stops at the main entrance.
History
The Terminal was designed by Timothy L. Pflueger in the Art Moderne style. Bids were taken for construction of the terminal in June 1937, excavation began on 29 July 1937, and the first steel was erected on 12 January 1938. Structural concrete was complete by May 1938. The San Francisco-Oakland Bay Bridge Electric Railway Terminal Building was formally dedicated on . State Director of Public Works Frank W. Clark turned the facilities over to the State of California, as represented by Lieutenant Governor Ellis E. Patterson, who turned over management of the facility to the three electric railroad companies. State officials and guests rode electric trains to the opening ceremony.
Construction of rail facilities (including laying tracks on the bridge and construction of the new San Francisco terminal) for the Bay Bridge had cost the state an estimated , and the state had invested an additional in rolling stock, which was leased to the railroad companies. The terminal cost was estimated at , and it was expected to serve upwards of 60,000 passengers per day.
Train service
Governor Frank Merriam piloted the first (ceremonial) electric train across the bridge on September 23, 1938, although regular service did not commence until January 1939, after the terminal was complete. Trains were controlled with a custom electric switchboard, which was considerably simpler than the typical mechanical lever system then in use. A loop was built so trains could turn around and go back across the bridge. Even after rail service ended, the loop continued to be used by AC Transit, Thruway Motorcoach and Greyhound buses until the station closed. Surprisingly, a track was never made to connect to the Southern Pacific's Third and Townsend Depot so trains could go further south. There were six tracks. Beginning on January 15, 1939, half of all Market Street Railway trains were rerouted to a loop in front of the building; all services were eventually rerouted here in 1941.