The Willapa Hills Trail is a intercounty rail trail in the U.S. state of Washington that is part of the Willapa Hills State Park. Following an east–west route alongside State Route 6, the tract links Chehalis and South Bend, traveling through or near several small towns and parks along the way. Overseen by the Washington State Park System, local cities and towns often maintain areas of the trail within their jurisdictions. The trail is built upon a decommissioned railroad track.

Route

The Willapa Hills Trail is rated as easy to moderate with minimal elevation gain and stretches from its eastern terminus at Chehalis, between Lintott-Alexander Park and Stan Hedwall Park, to the western cessation that is near downtown South Bend, Washington.

Willapa Hills Trail

The trail in Lewis County contains 18 bridges and crosses the Newaukum River by way of the Northern Pacific Railway Newaukum River Bridge near the Chehalis trailhead,; it passes over the Chehalis River five times in the county. A spur traverses through Rainbow Falls State Park near Dryad and passes by the ghost town of Walville.

Willapa Hills Trail

The path crosses several creeks in Pacific County, and twice over the Willapa River; the trail follows the river as it courses mostly through farmland and forest. Users can stop at Willie Keil's Grave State Park Heritage Site, north of Menlo. The trail starts to accompany U.S. Route 101 in Raymond.

Willapa Hills Trail

Mostly complete within Lewis County, with a mix of pavement and compact gravel, the trail is only completed between Raymond and South Bend in Pacific County with large tracts in the county considered unimproved, though useable with caution. The trail is under the maintenance auspices of the Washington State Park System and is open for non-motorized activities year round to hikers, bicyclists, and horse riding.

Cities, towns, and communities

The trail intersects or passes near the following locations, from east to west:

Lewis County

Claquato

Littell

Adna

Millburn

Ruth

Ceres

Meskill

Dryad

Doty

Pe Ell

McCormick

Pacific County

Frances

Lebam

Holcomb

Menlo

Raymond

History

The trail, known locally at first as "Rails to Trails", was built over a decommissioned railroad line originally constructed by Northern Pacific Railway in 1892. The rail line, considered a spur, was used for both freight and passenger service. Passenger trains were cancelled in 1954, with rail freight declining by the 1980s due to a combination of the increase of the hauling of goods by truck and a decrease in timber production. The line for commercial purposes continued until 1990 when it would be designated as abandoned by the owner at the time, Burlington Northern Railroad. The Washington State Parks and Recreation agency acquired the entire stretch in 1993.

Volunteer efforts and local fundraising led to minor improvements to the new trail until 2007 when the first large-scale effort was begun. In association with several Native American tribes, such as the Chehalis, Cowlitz, and Shoalwater, and with a combined $1.4 million in funding from various federal and state agencies, the early renovation efforts included specific attention to a 5-mile (8.0 km) stretch between Chehalis and Adna for paving, various surfacing of the rail bed, restoring trestles, and improving trailheads. Due to damage from floods during the Great Coastal Gale of 2007, several bridges and trestles were repaired. The last phase of improvements in Lewis County was refurbishing a 4-mile (6.4 km) section from Pe Ell west to the county line. Completed in 2018, the $600,000 project was funded by charitable donations and grants from various state government agencies.

Construction of a $3.3 million pedestrian bridge over Washington State Route 6, less than one mile west of Claquato, was begun in 2021 to lessen vehicular dangers for users of the trail. The overpass was completed in June 2023 and named the Littell Bridge in recognition of the local unincorporated community of Littell where it was built.

The trail is planned to be "rideable all the way through" by 2024 due to a combination of restoration projects in Pacific County totaling $8.7 million. The financing is provided by the Washington Wildlife and Recreation Program (WWRP), various federal and state funding, and donations from the community. The 2024 project is overseen by the Washington State Parks and Recreation Commission and the trail would be considered unimproved at a 15-mile midsection stretch, though a schedule for additional funding and completion is foreseen in 2026.