At 0610 on the morning of 19 August, 3/5’s 81-mm. mortars prepared the way for the final drive on Objective Three. Following close in the wake of the mortar bursts, Second Lieutenant Thomas P. Lennon led Company H through evacuated enemy positions. He reached the northern part of Hill 311 without meeting any opposition.

This last Brigade objective was secured at 0645, leaving 1/5 atop Obong-ni Ridge, 2/5 on Hill 207 to which it had displaced on the 18th, and 3/5 in possession of the dominating height of the Naktong Bulge. The reduction of the enemy bridgehead cost the Marines 66 dead, 1 missing in action, and 278 wounded.

U.S. Marine Operations in Korea 1950-1953 Volume I (of 5) — Part 149

_The Famous Bean Patch--Planning for Inchon Landing--Return to the Naktong Bulge--All-Out NKPA Offensive--The Marines Jump Off--Progress of Brigade Attack--Assault on Hill 117_

U.S. Marine Operations in Korea 1950-1953 Volume I (of 5) — Part 149

It was all over but the mopping-up operations. Battalion areas were carefully patrolled on 19 August to clear them of NKPA snipers or stragglers. During this process a patrol ranging along the Naktong river discovered three enemy 122-mm. howitzers hidden in a strip of woods on a hill. The pieces had not been touched by Marine air or artillery. What was more surprising, they were emplaced in a column to fire over one another--something new and wonderful that the Marines had never seen before.[319] General Craig concluded that these howitzers had fired the shells which landed on Marine positions to the bitter end.

U.S. Marine Operations in Korea 1950-1953 Volume I (of 5) — Part 149

[319] This section is derived from: LtGen Edward A. Craig (Ret), ltr to author, 23 May 54 (Craig, 23 May 54).

The next day the Brigade commander took a helicopter to 24th Division Headquarters to confer with General Church. There he was informed that the Marines had been detached from 24th Division operational control to Eighth Army reserve. Church complimented the Brigade warmly on its performance, and letters of commendation were later received both from him and CG EUSAK.

At 1300 on the 21st Craig arrived by helicopter at a new Brigade bivouac area near Masan that was to be recorded in capital letters as the Bean Patch. It was just that--a bean patch large enough to accommodate a brigade. But from this historic spot the Marines were to fight their way around the peninsula during the next 5 months and complete the circuit to their identical starting point.