The Northern Counties Committee (NCC) was a railway that served the north-east of Ireland. It was built to Irish gauge () but later acquired a number of narrow gauge lines. It had its origins in the Belfast and Ballymena Railway that opened to traffic on 11 April 1848.
The NCC itself was formed on 1 July 1903 as the result of the Midland Railway of England taking over the Belfast and Northern Counties Railway (BNCR), which the Belfast and Ballymena Railway had become. At the 1923 Grouping of British railway companies, the Committee became part of the London, Midland and Scottish Railway (LMS). After the nationalisation of Britain's railways in 1948 the NCC was briefly part of the British Transport Commission, which sold it to the Ulster Transport Authority (UTA) in 1949.
The BNCR and its successors recognised the potential value of tourism and were influential in its development throughout Northern Ireland. They were able to develop and exploit the advantages of the Larne to Stranraer ferry route between Northern Ireland and Scotland which gained importance in World War II.
Belfast and Ballymena Railway
Proposals
There had been a proposal by the Davison brothers of Ballymena to build a railway between Belfast and Ballymena in 1836 but this came to nothing due, firstly, to the inability to identify a suitable route out of Belfast that did not include excessive gradients and, secondly, an economic downturn.
However, in 1844, the same promoters, in association with Sinclair Mulholland, William Coates and John McNeile of Belfast drew up a new scheme that included a branch to Carrickfergus. Charles Lanyon was employed to carry out preliminary surveys of the proposed route.
In fact, two routes out of Belfast were surveyed. One was an inland route beginning at the Antrim Road and skirting Cavehill. The other started at the junction of York Road and Corporation Street; it ran north on an embankment across slob land on the western shore of Belfast Lough. To ease the gradient, it was necessary for the line to Ballymena to leave the Carrickfergus branch by means of a trailing junction from Belfast. Lanyon strongly favoured this latter coastal route and reported accordingly at a public meeting in Antrim courthouse on 20 May 1844. A motion was carried that a complete survey of the line was to be completed and that costs were to be defrayed by opening a subscription.
A prospectus was issued in September 1844 with an optimistic review of the financial prospects for the undertaking. There was a good response and capital accumulated steadily from both sides of the Irish Sea. By 1848, the Belfast and Ballymena Railway (B&BR) would have 221 shareholders.
Parliamentary approval
The next stage was to obtain Parliamentary approval for the B&BR's original line plus a branch to Randalstown. A bill was duly lodged and came before a Committee of the House of Commons in April 1845. Clauses were inserted at the Belfast Harbour Commissioners' request to protect them from possible competition from the harbour at Carrickfergus. The promoters were able to assuage the committee's fears that the works would be heavy and costly and the bill received Royal Assent on 21 July 1845 as "An Act for making a Railway from Belfast to Ballymena in the County of Antrim, with Branches to Carrickfergus and Randalstown".
Building the line
Lanyon immediately began preparations for building the line and placed advertisements for tenders for the construction of the railway. The contract was awarded to William Dargan. Orders were placed for rails and sleepers and locomotives were ordered from Bury, Curtis and Kennedy.
Meanwhile, the directors were recruiting staff. A secretary was appointed in 1845, Ellis Rowland was appointed locomotive superintendent in 1847 and Thomas H. Higgin became manager in May 1848.
By the spring of 1847, portions of the line were ready for ballasting and, as neither Dargan nor the B&BR had any locomotives, a second-hand engine was obtained from the Ulster Railway to carry out the work. While it had been hoped to open the line in November 1847, this was put back by the need to raise the embankment along the shore of Belfast Lough.
Stations were built along the main line and the Carrickfergus branch. The most impressive was that at Belfast where Lanyon used his architectural talents to create an imposing classical design.