The 79th Street Boat Basin is a marina located in the Hudson River on the Upper West Side of the New York City borough of Manhattan, on Riverside Park at the foot of West 79th Street. Maintained and operated by the New York City Department of Parks and Recreation, it is the only facility in the city that allows year-round residency in boats, so it's known as a hub for houseboat living in NYC.
History
Early history of the site
During the early years of New York City, the current site to Riverside Park was largely undeveloped, consisting of rocky outcroppings and steep bluffs along the Hudson River shoreline. Prior to European arrival, Native Americans sparsely populated this rough terrain. In 1846 the Hudson River Railroad laid tracks across the Hudson River shoreline to speed the transport of goods from Albany to Manhattan. In 1865, William R. Martin, a commissioner on the Board of Central Park proposed a scenic drive and park along the Hudson River. During the next two years New York City acquired land between the Hudson River Railroad and the bluffs along the shoreline, and in 1873 the New York City Park Board commissioned Riverside Park. The co-designer of Central Park, Frederick Law Olmsted, was named lead designer. His design, which was accepted in 1875, included a winding drive for horses and sight-seeing, as well as pedestrian walkways, both accessible from the neighborhoods to the east.
The park was completed by Olmsted's successor Calvert Vaux, but was soon surrounded by coal bins, shacks and garbage dumps.
Robert Moses era
By 1921, Riverside Park had deteriorated to an expanse of mud. Barbed-wire fences cut the citizens off from the waterfront. In the early 1920s, the architecture firm of McKim, Mead and White had submitted a proposal with an elevated traffic circle, covering the railroad tracks beneath. The traffic circle was partially built, and portions of a highway were also under construction on Manhattan's West Side. This drew the attention of citizens and politicians to this neglected area.
The City of New York announced the West Side Improvement Project in 1934. Robert Moses was at this time New York City's parks commissioner, and he took over the project. Moses expanded it into a grand architectural multi-level entry and exit from the Henry Hudson Parkway, all under the name of the "79th Street Grade Crossing Elimination Structure". The multi-level structure was designed by Gilmore David Clarke. Moses was able to raise $109 million to begin the project, for which the Works Projects Administration provided the equivalent of $ million today.
Moses hired the architect and engineer Clinton Lloyd to work on the structural elements with the landscape architect, Gilmore Clarke, to work on the landscape. The structure was built mostly from concrete, but the above-ground part is clad in cut stone. The initial McKim, Mead and White plan had called for rough-cut, dark stone to be applied to the exterior of the building, but Clinton Lyod modified their plan and used lighter, finer cut stone. The project created the Freedom Tunnel, an underground parking garage, a restaurant, and the marina. The rotunda was designed to hold the weight of the heavily used traffic circle that sits atop the building. The large support columns are visible inside the café.
The 79th Street Rotunda and Boat Basin and the rest of the West Side Improvement Project were finished in 1937.
Later years
By the 1960s, though the restaurant was long gone, the majority of slips were occupied by year-round boaters. Year-round residents have included Mad Magazine writer Dick DeBartolo, who uses a boat as his office. Mario Puzo and Frank Sinatra have all used the basin to moor their boats. In the 1960s, Roy Cohn docked his yacht here, and used it to entertain the city's political leaders.
In 1979, the city sought to cancel a 1977 concession agreement with Nichols Yacht Yards to operate the marina, claiming that Nichols had underreported revenue and had acted as an "absentee slumlord". Boat owners would manage the marina until a suitable operator would be found. Though Nichols obtained an injunction blocking the dismissal in December 1979, the firm's operation of the facility ended in 1982, with Nichols having spent $250,000 in legal fees to battle the city and counter a rent strike by boat owners.