San Emidio Geothermal Plant, in Washoe County, Nevada, is a geothermal power plant with a design capacity of . The upgraded plant went online on May 25, 2012.

History

The plant is the second to occupy the site. The older plant, originally known as the Empire Geothermal Plant, which was sold by Empire Geothermal Power LLC to U.S. Geothermal Inc. in 2008, was commissioned in 1987. Phase I of the reconstruction added an generator.

San Emidio Geothermal Plant

In January, 2020, the BLM initiated an environmental assessment concerning a possible new power plant, substation, as many as 25 geothermal and injection wells, a 7.5 mile above ground pipeline and a 58 mile long power line terminating in Fernley, NV. The powerline will parallel an existing 500kV line and use existing access roads.

San Emidio Geothermal Plant

Future expansions

Phase II (Initially planned for 3Q 2013) (2020) Phase III with

San Emidio Geothermal Plant

Notes

Energy infrastructure completed in 2012

Buildings and structures in Washoe County, Nevada

Geothermal power stations in Nevada