The Bangkok Mass Transit System, commonly known as the BTS Skytrain ( [BTS]), is an elevated rapid transit system in Bangkok, Thailand. It is operated by Bangkok Mass Transit System PCL (BTSC), a subsidiary of BTS Group Holdings, under a concession granted by the Bangkok Metropolitan Administration (BMA) which owns the lines. The system consists of 62 stations along three lines with a combined route length of . The BTS Sukhumvit Line running northwards and south-eastwards, terminating at Khu Khot and Kheha respectively. The BTS Silom Line which serves Silom and Sathon Roads, the central business district of Bangkok, terminates at National Stadium and Bang Wa. The Gold Line people mover runs from Krung Thon Buri to Klong San and serves Iconsiam. The lines interchange at Siam station and Krung Thon Buri. The system is formally known as "The Elevated Train in Commemoration of HM the King's 6th Cycle Birthday" ().

Besides the three BTS lines, Bangkok's rapid transit system includes the underground and elevated Mass Rapid Transit (MRT) lines, the Bus Rapid Transit System (BRT), and the elevated Airport Rail Link (ARL), serving several stations before reaching Suvarnabhumi Airport, and the SRT Red Lines of the State Railway of Thailand.

BTS Skytrain

History

Plans for mass transit in Bangkok began in the early-1980s. An early version of the Skytrain project was known as the Lavalin Skytrain because it was designed using the Vancouver SkyTrain as a model, adopting technology developed by SNC-Lavalin. Due to political interference, the concession with Lavalin was cancelled in June 1992, despite Bangkok's chronic traffic congestion. The Thai Government focused on increasing road and expressway infrastructure in an attempt to reduce the congestion. This had little impact as the number of cars on the road continued to increase dramatically. The routes considered as part of the Skytrain project would become the basis for the MRT system and are mainly underground. In the early-1990s, foundations and a viaduct for the Lavalin Skytrain were constructed in the middle of the Phra Pok Klao Bridge across the Chao Phraya River. The planned metro bridge remains unused but may become part of the MRT's future Purple Line.

BTS Skytrain

Another abortive attempt at building an elevated rail network was the Bangkok Elevated Road and Train System (BERTS), which was terminated in 1998 after only 13.77 percent had been completed.

BTS Skytrain

Shortly after it became clear that the Lavalin Skytrain had stalled, then-Governor Major General Chamlong Srimuang asked his deputy, Captain Kritsada Arunwong na Ayutthaya, to create a new feeder system with a route along Sukhumvit and Silom Roads. Krisda and his team from the Bangkok Metropolitan Administration (BMA) succeeded in finding a private investor. Krisda also convinced everyone concerned to allow the city supervise the project. Keeree Kanjanapas founded the Bangkok Transit System Corporation (BTSC) and it successfully financed the system and grew it from a feeder system to a full mass transit project. Thanayong Public Company Limited ) had a 28 percent stake in BTSC when the Skytrain began, and therefore in its early days the system was sometimes referred to as the "Thanayong Skytrain".

Siemens, the supplier of the railway technology, and the Thai contractor, Italian Thai Development, built the system for BTSC. The "Skytrain" name was bestowed later by the press following the Vancouver example where the elevated metro had been named "Skytrain". Originally, the Skytrain depot was to be built underneath Lumphini Park, but due to widespread objections from Bangkok residents it was constructed on a parcel of land on Phahonyothin Road, replacing the old northern/northeastern bus terminal (Mo Chit). The current depot at Mo Chit is part of the proposed "Bangkok Terminal" project, where a large complex composed of a new regional bus terminal, park and ride facility, and other commercial development can be built directly above it.