Meiningen station is a junction of four railways and with its facilities is one of the most important railway stations in southern Thuringia, Germany.
It consists of two once separate stations, the former Prussian station as a through station on the Werra Railway and the Bavarian station as a terminal station on the Schweinfurt–Meiningen line.
Location
Meininger station is located at the 60.69 km mark of the Werra Railway (from Eisenach) and at the 77.90 km mark of the Schweinfurt–Meiningen line (from Schweinfurt). The station is located on the eastern edge of the city of Meiningen next to the English Garden and separates the city centre from the Eastside district. The old town and many public facilities such as the Meiningen Theatre, Schloss Elisabethenburg (castle), hotels and the law courts are located nearby.
History
The plan for the construction of a railway station in Meiningen was developed as early as 1838, as part of the first project for a railway line through the Werra valley. The site for the railway tracks was originally in the northwest of the town at the foot of the Herrenberge mountain, but this project fell through. 20 years later after a construction period of two years the station was inaugurated on 2 November 1858 at its present location with the opening of the Werra Railway. The station was the seat of the Werra Railway Company (), which had received the concession for the construction and operation of the Werra Railway. At its opening, the station already consisted of the station building and six other buildings, including a locomotive depot with a repair shop and coke, carriage and freight sheds. To meet the ever-increasing need for maintenance and repair work storage sidings were built on the Werra line. In 1863 a rail depot was built with a roundhouse and a turntable opposite the entrance building, requiring the locomotive shed to be partly demolished.
On 15 December 1874 the Royal Bavarian State Railways, put the Schweinfurt–Meiningen line into operation. It built south of the existing Werra Railway station a separate "Bavarian" station (Bayerischen Bahnhof) as a terminus, with entrance building, platforms, a locomotive depot with five stalls, a turntable and other tracks. The two sections of the station were connected by two sets of points only. This nearly doubled the railway premises, which extended now for over 1,300 metres between the two connecting tracks at each end. As the number of tracks at the crossing of the Marienstraße increased from two to ten, controlling traffic with barriers was no longer considered reasonable. So a 100 metre long tunnel was built, crossing under the railway tracks and platforms, connecting the city centre and the Oststadt district with one another. The construction of the Bavarian station and the tunnel made it necessary to lower Marienstraße and the connecting road network and to carry out large changes in the wider environment of the station. So the street network to the east of the railway property had to be rearranged and the road to Rohr was rebuilt on a new alignment.
With the opening of the Neudietendorf–Ritschenhausen railway in 1884, the station was on a long-distance route connecting Berlin with Stuttgart via Erfurt and Würzburg. In 1895, the Prussian state railways acquired the Werra Railway and its railway facilities became the "Prussian" station (Preußischen Bahnhof). By 1900, a one-storey building wing, a new station hall with a staircase and a loading ramp were built between the Prussian and Bavarian buildings. The adjoining workshop has developed by 1900 into a connected building complex, 200 metres long, with 26 locomotive stalls and a number of workshops and other facilities. As the capacities of the main workshop soon reached their limits, in 1914 the Prussian state railway built a new main workshop, one km north of the station, later called "RAW Meiningen" and now operating as Meiningen Steam Locomotive Works. The old main workshop was dismantled and converted back into a train depot. In the following years all platforms were extended and provided with canopies except for platform 2.