State Highway 21 (SH 21), also known as Powers Boulevard, is an expressway in El Paso County, in eastern Colorado Springs. SH 21 currently extends from SH 16 (Mesa Ridge Parkway) in Fountain at its southern end to Interquest Parkway/SH 83 in the north side of Colorado Springs. Extensions to I-25 near North Gate Boulevard are in progress, and extensions south to I-25 near Pikes Peak International Raceway are proposed, and the road is planned to be converted to a freeway in the long-term future.
Route description
SH 21 begins at an intersection with SH 16, also known as Mesa Ridge Parkway in Security-Widefield, as a continuation of SH 16 and heads north. It then turns to the west and then turns back north as it bypasses the Colorado Springs Airport. It then continues north through eastern Colorado Springs as an expressway with a 55 mph speed limit. At the intersection with Fountain Boulevard, the route then runs concurrent with US 24 until reaching a partial cloverleaf interchange at Platte Avenue, where US 24 splits from SH 21 and heads east. SH 21 remains as an expressway going north through a densely populated area of Colorado Springs. After the intersection with Dublin Boulevard, it becomes a semi-freeway with a 65 mph speed limit until reaching its northern terminus at SH 83's southern terminus. The route's mileposts are lined up with the mileposts on I-25 and rather than starting at 0, it begins at mile 132 at its southern terminus.
The northern section, from Interquest Parkway/SH 83 to Dublin Boulevard is constructed to interstate highway standards with sufficient right-of-way to construct planned overpasses and on/off-ramps. CDOT completed interchanges and bridges at Union Boulevard and Briargate Parkway in 2013, an interchange at Old Ranch Road in 2015, and a diverging diamond interchange at Research Parkway in 2022. Future interchanges at SH 83 and Voyager Parkway are in progress. The whole route from I-25 to Milton E. Proby Parkway is planned as a controlled-access freeway.
History
In 1964, the City of Colorado Springs included the "Powers Corridor" in its major thoroughfare plan as a bypass of the city two miles east of Academy Boulevard, and, in the 1970s, Colorado Springs and El Paso County recommended that Powers Boulevard be constructed "at least to expressway standards" and proposed it to be included in the Interstate Highway System.
Thoroughfare development
As interest in development near Powers Boulevard grew over the 1980s, developers formed a metropolitan district to fund an expansion of the road from Platte Avenue to Woodmen Road by issuing bonds.
Planning and construction of Powers Boulevard continued through the 1990s. The segment between Fountain Boulevard and Platte Avenue was included in the Colorado Springs US 24 bypass and reconstructed as an expressway; the city additionally extended the road south from Fountain Boulevard to Fontaine Boulevard. The Powers corridor was included in the National Highway System, and studies were prepared to extend the road to I-25 north and south of Colorado Springs. In June 1999, the City of Colorado Springs, El Paso County, and CDOT completed an agreement for a phased transfer of ownership for Powers Boulevard. According to the plan, over the following years, CDOT would assume ownership of Powers Boulevard with the intent to develop it as a limited-access freeway, and, in exchange, the city would assume ownership of several CDOT-owned roads, including the I-25 Business Loop along Nevada Avenue and SH 83 north of US 24; at this time, Powers Boulevard was planned to be the new path of SH 83 through Colorado Springs. In March 2000, the Colorado Transportation Commission adopted a resolution designating the future Powers Boulevard between I-25 and Woodmen Road as a freeway.
The first interchange along Powers Bouelvard, a partial cloverleaf at Platte Avenue, was finished in 2001. The southern end was extended to Mesa Ridge Parkway this year, as well. Between 2001 and 2005, Powers Boulevard was extended north from Woodmen Road to SH 83 as an at-grade expressway, with right-of-way preserved for future interchanges.