The Chengdu–Chongqing intercity railway () is a long high-speed railway that connects the cities of Chengdu (Sichuan) and Chongqing in southwestern China, with a maximum speed of . The route passes through most of the same cities that the older Chengdu–Chongqing Railway does, but is significantly shorter due to the greater use of elevated sections and tunnels. The line includes four major elevated sections and two tunnels.

History

Construction on the Chongqing section began on 22 March 2010 while work on the Sichuan section began on 11 November. The final tunnel achieved breakthrough on 16 December 2013 and a single track line was expected to open in first half of 2014. The complete double track configuration was due to be completed by the end of 2014. The line started operation on 26 December 2015, initially to Chongqing North until renovations were completed at Shapingba on 25 January 2018.

Chengdu–Chongqing intercity railway

Journey time

The railway reduced travel time between Chengdu and Chongqing to 75 minutes, 45 minutes quicker than the previous fastest route via Suining. Travel time was reduced further to only one hour on 24 December 2020, with the introduction of Fuxing trains and operations on the line.

Chengdu–Chongqing intercity railway

An additional line is planned which will offer a faster journey time when complete, the Chengdu–Chongqing Central line high-speed railway.

Chengdu–Chongqing intercity railway

Railway stations

There are 12 stations along the line:

Sichuan section

Chengdu East railway station

Jianyang South railway station

Ziyang North railway station

Zizhong North railway station

Neijiang North railway station

Longchang North railway station

Chongqing section

Rongchang North railway station

Dazu railway station

Yongchuan East railway station

Bishan railway station

Shapingba railway station

Chongqing railway station

References

External links

High-speed railway lines in China

Rail transport in Chongqing

Rail transport in Sichuan