Kolkata Metro Line 3 or the Purple Line is a line of the Kolkata Metro. The stretch from Joka to Taratala of the line was inaugurated on 30 December 2022. The route spans from Joka in the south, to Esplanade in the north with an extension of to Diamond Park from Joka. It will connect Kolkata Metro Line 1 at Park Street in central Kolkata and run in parallel up to Esplanade in central Kolkata where it will connect Kolkata Metro Line 2 also. Line 3 is being built by Rail Vikas Nigam Limited.

Development

It is partially elevated and partially underground: around of the project will be elevated and the rest of the metro line will be underground. The project is getting delayed due to nonavailability of land for the construction of train depot at Joka. In 2019, RVNL was given the land required for building the depot and the construction for its boundary wall and land development started in February 2019. Tenders for its construction and plant & machinery were invited in April 2020.

Kolkata Metro Line 3

Construction was further delayed in September 2018 due to the Majerhat Bridge collapse, the metro was being built right next to the bridge.

Kolkata Metro Line 3

Tender for Majherhat to Esplanade underground section has been floated in 1st week of December 2019.

Kolkata Metro Line 3

By 15 September 2022, the stretch from Joka to Taratala has been fully constructed and electrification has been done. Testing trials are underway from Joka to Taratala using the old decommissioned Metro Rakes. Eventually in service there will be new air conditioned metro rakes. The stretch from Majerhat to Esplanade is under construction.

Prime Minister Narendra Modi inaugurated the Joka-Taratala stretch, including Joka metro station of Kolkata Metro's Purple Line on 30 December 2022 in the presence of West Bengal Chief Minister Mamata Banerjee and Indian Railway Minister Ashwini Vaishnaw. Some students from schools especially St Thomas Boys School, whose premises are utilised for planned Khidirpur metro station in this stretch, were granted the rare opportunity to be the first ones to ride in this Joka-Taratala stretch after the inauguration.

List of stations

The work has been sanctioned in 2010-11 for the new Metro line from Joka to B.B.D. Bagh for a length of at an anticipated cost of Rs. 2619.02 Crores. But, later the route was shortened and planned to terminate at Esplanade. A separate Depot is under construction in Joka. It is being built by RVNL and the tender has gone to Simplex Infrastructures. The extension of this line to IIM and Diamond Park for has been sanctioned in the Budget of 2012–13 at a cost of Rs. 294.49 Cr. The execution of this work has been entrusted to RVNL.

There are 3 phases in this line-

Joka to Taratala (Operational) Taratala to Esplanade (Under construction) Diamond Park to Joka (Planned)

Gallery

See also

List of Kolkata metro stations

Kolkata Metro Rolling Stock

2018 Kolkata bridge collapse

Kolkata Suburban Railway

References

Kolkata Metro lines

Kolkata Metro

750 V DC railway electrification