=Maintenance of Plants.=--If it should be necessary to retain a consulting engineer to install an engine capable of filling all requirements, it is also necessary to select a careful attendant in order that the engine may be kept in good condition. It is a rather widespread belief that a gas-engine can be operated without any care or inspection. This belief is all the more prevalent because of the employment of street-gas engines, which, by reason of their simplicity of construction and regularity of fuel supply, often run for several hours, and even for an entire day, without any attention whatever. But this negligence, particularly in the case of engines driven from producers, is likely to produce disastrous results. Although engines of this type do not require constant inspection during operation, still they require some attention in order that the speed may be kept at a fixed number of revolutions. Moreover, the care of the engine, the cleaning of the valves and of the various parts which are likely to become dirty, and the examination and cleaning of pipes, should be accomplished with great care and at regular intervals. This task should be entrusted only to a man of intelligence. A common workman who knows nothing of the care with which the parts of an engine should be handled is likely to do more harm than good.
The factory owner who follows the instructions which have been given in this book will avoid most of the stoppages and the trouble incurred in engine and generator installations, and may count upon a steadiness of operation comparable with that of a steam-engine.
TEST OF A "STOCKPORT" GAS-ENGINE WITH DOWSON PRESSURE GAS PLANT
Made by R. Mathot at the Works of the "Union Electrique" C^{ ie}, Brussels, June 27, 1901
Piston Diameter: 15-1/2". Piston stroke, 22". Normal number of revolutions, 210.
1. Calorific value of the coal 12750 B.T.U. 2. Nature and origin of fuel: Anthracite coal of Charleroi (Belgium). 3. Cost of fuel per ton at the mine $5.50 4. Cost of fuel per ton at the plant $6.39 5. Fuel consumption per hour in the generator 46.3 lbs. 6. Fuel consumption per hour in the boiler 7 lbs. 7. Proportion of ash in the coal 6 per cent. 8. Weight of steam at 66 lbs. generated per hour 42.7 lbs. 9. Average brake horse-power 53 B.H.P. 10. Fuel consumption for gas per B.H.P. per hour 0.875 lbs. 11. Fuel consumption for steam per B.H.P. per hour 0.133 lbs. 12. Total fuel consumption 1.008 lbs. 13. Steam consumption at 66 lbs. pressure 0.81 lbs. 14. Gas pressure at the engine 1-3/8 inches 15. Weight of water per B.H.P. per hour for cooling the cylinder entering at 68° F. and leaving at 105° F. 51.5 lbs. 16. Corresponding heat absorbed in cooling 1970 B.T.U. 17. Average initial explosive pressure on piston 324 lbs. 18. Average pressure on piston per square inch 72 lbs. 19. Average indicated horse-power with 85 per cent. misses 92.5 I.H.P. 20. Corresponding mechanical efficiency 84 per cent. 21. Corresponding electric load 31.950 K.W. 22. Cost of B.H.P. per hour in anthracite $0.0029 23. Cost of kilowatt per hour in anthracite $0.0048 24. Electric power generated per B.H.P. 602.8 W. 25. Thermal efficiency at 53 B.H.P. with 85 per cent. explosions 18.5 per cent.