_Operating Dredges and Trawls in deep Seas._--Dredging operations from large vessels in deep seas present numerous difficulties. The great weight of the ship makes her motion, whether of progress or rolling, irresistible to the dredge. The latter tends to jump, therefore, which both lowers its efficiency and causes it to exert a sudden strain on the dredge rope.

The efficiency or evenness of dredging was secured, therefore, by the special device of fastening a heavy weight some 200 or 300 fathoms from the dredge end of the dredge rope. This was either lowered with the dredge or sent down after by means of a "messenger," a ring of rope fixed round, but running freely on, the dredge rope. The latter plan was used on the "Challenger"; the weights were six 28 lb. leads in canvas covers: their descent was arrested by a toggle or wooden cross-bar previously attached to the rope at the desired point. When, however, the rope used is of wire this front weight is unnecessary.

Encyclopaedia Britannica, 11th Edition, Volume 8, Slice 7 — Part 210

The possibility of sudden strain necessitates a constant watching of the dredge rope, as the ship's engines may at any moment be needed to ease the tension by stopping the vessel's way, and the hauling engines by paying out more rope. The use of accumulators both renders the strain more gradual and gives warning of an increase or decrease; indeed they can be calibrated and used as dynamometers to measure the strain. One of the best forms of accumulator consists of a pile of perforated rubber disks, which receive the strain and become compressed in doing so. The arrangement is in essence as follows. The disks form a column resting on a cross-bar or base, from which two rods pass up one on each side of the column. Another cross-bar rests on the top disk, and from it a rod passes freely down the centre perforation of disks and base. Eyes are attached to the lower end of this rod and to a yoke connecting the side rods at the top: a pull exerted on these eyes is thus modified by the elasticity of the dredge. In the "Porcupine" and other early expeditions the accumulator was hung from the main yard arm, and the block through which the dredge rope ran suspended from it. In more recent ships a special derrick boom is rigged for this block, and a second accumulator is sometimes inserted between the topping lift by which this is raised and the end of the boom.

Encyclopaedia Britannica, 11th Edition, Volume 8, Slice 7 — Part 210