Authorities are generally agreed that the sludge problem is the center of the entire sewage problem, because it causes more trouble and is the most expensive part of the treatment. The method of handling it is just as important as the treatment of the sewage.
Wet sludge can be pumped out on land or into shallow places or it can be sent to sea in ships and allowed to sink. If pumped on land it must be spread out in very thin layers. If discharged into trenches it is ploughed into the ground after it has dried. In either case a large area of land is necessary and odors cannot be eliminated. Only cities located on or near the seashore can send their sludge to sea, and then the cost of disposal is rather high.
Sludge can be dried by pressing, in centrifugal drying machines, by mixing with some dry matter or by discharging upon drying beds. The cost of pressing is high, depending upon the amount of lime added, the kind of sludge pressed, and the size of the works. George S. Webster states that the average cost in large cities is ten cents per ton of wet sludge. It is especially applicable to chemical precipitation works as it must first be treated with lime or coal powder. When dried in machines the liquid contains much organic matter and is objectionable. The simplest method is to discharge the sludge upon drying beds of porous material and underdrained. The time for drying depends upon sewage treatment. Imhoff tank sludge will dry in less than a week, septic tank sludge in two weeks or more, and sludge from plain sedimentation will require about two months in summer and almost five months in winter. Cleveland, in order to overcome weather conditions at its experimental plant, built a covered sludge bed, modeled after standard greenhouse construction. The report from the Testing Station is that during summer the period of drying is approximately the same as or possibly a little longer than with open beds. Eliminating the three winter months, the station report says, it is possible to operate beds of this type so that one square foot of surface will dry 0.8 cubic feet of sludge per year. Francis E. Daniels suggests that sludge can be handled faster by drying a small portion at one time and removing it from the bed before the next portion is drained off.