Further use was made of armoured trains in the _Egyptian Campaign of 1882_. One that was put together to assist in the defensive works at Alexandria is declared in the official history of the campaign[15] to have "proved most serviceable." Two of the trucks, fitted with iron plating and sand bags as a protecting cover, carried one Nordenfelt and two Gatling guns. A 9-pr. was also placed on one of the trucks, together with a crane by means of which it could be lowered out immediately. Other trucks, rendered bullet proof by sand bags and boiler-plating, and carrying a force of 200 bluejackets, with small arms, completed the fighting force. On July 28, the train took part in a reconnaissance sent out to ascertain the extent of the damage which had been done to the railway lines near Arabi's outpost. Shots were fired at the train by the enemy, but without effect. The reconnaissance was a complete success inasmuch as it enabled such repairs to be done to the railway as gave the use of a second line between Ramleh and Alexandria.

So useful had the train been found that it was now further improved by adding to it a 40-pr. on a truck protected by an iron mantlet. The locomotive was put in the middle of the train and was itself protected by sand bags and railway iron. Thus strengthened, the train went into action in the reconnaissance in force carried out from Alexandria on August 5, and "the most interesting incident of the engagement," according to the official account, "was the good service done by the 40-pr. from the armoured train."

The Rise of Rail-Power in War and Conquest, 1833-1914 — Part 63

Early in the morning of September 13 the train, consisting of five wagons, and having, on this occasion, one Krupp gun and one Gatling in addition to the 40-pr., was sent to support the attack on Tel el-Kebir. It was followed by another train having 350 yards of permanent-way materials, with all the necessary tools and appliances for the prompt carrying out of any repairs that might be necessary. Owing, however, to the hazy and uncertain light and to the ever-increasing clouds of smoke that hung over the battle-field, it was impossible to fire the 40-pr.

The Rise of Rail-Power in War and Conquest, 1833-1914 — Part 63

In the futile attempt made in 1885 to construct a railway from Suakin to Berber, in support of the _Nile Expedition of 1884-85_, resort was had to an armoured train for the purpose of protecting the line from the constant attacks to which it was subjected by the enemy. The train carried a 20-pr. B.L., which could be fired only either in prolongation of the line or at a slight angle from it.

The Rise of Rail-Power in War and Conquest, 1833-1914 — Part 63