The Embraer E-Jet E2 family are medium-range twinjet airliners designed and produced by the Brazilian aircraft manufacturer Embraer. It was developed as a successor to the original E-Jet family.

The program was launched at the Paris Air Show in June 2013. The E-Jet 2 is a derivative of the original E-Jet family paired with several improvements, chiefly the adoption of more fuel-efficient Pratt & Whitney PW1900G turbofan engines. The family comprises three variants that share the same four-abreast narrow-body fuselage with different lengths and three different new wings, fly-by-wire controls with new avionics, and an updated cabin. The first variant, the E190-E2, made its maiden flight on 23 May 2016 and flight testing proceeded to schedule with little issue. It received certification on 28 February 2018 before entering service with launch customer Widerøe on 24 April. Certification of the larger E195-E2 was received during April 2019; Azul Brazilian Airlines was the first airline to operate this model.

Embraer E-Jet E2 family

Development of the smaller E175-E2 has been delayed; deliveries were originally set to begin sometime in 2021. In February 2022, Embraer announced that development of the E175-E2 would be put on hold for three years and that deliveries are thus expected to begin between 2027 and 2028.

Embraer E-Jet E2 family

Development

Background

During the early 2010s, the regional jets segment of the international airliner market grew more competitive with the announcement of the Airbus A320neo and the Boeing 737 MAX, thus it was thought that Embraer would have to respond or else lose the competitiveness of the E-Jet family through inaction. In 2010, Embraer was reportedly considering directly challenging the Bombardier CSeries (now A220) by producing a clean-sheet five-abreast design for 100 to 150 passengers. The alternative option was to somehow improve the E-Jet family to maintain its attractiveness to customers.

Embraer E-Jet E2 family

In November 2011, Embraer announced at the Dubai Air Show that it had committed to producing new variants of its E-Jet family. This option was both lower risk and lower cost than pursuing a cleansheet design. At the time, Embraer reportedly foresaw a demand for 6,400 commercial jets with capacity of up to 130 seats over the following 20 years. The smallest of the new variants, the E-175-E2, seats up to 88 passengers in a single class configuration, the medium-sized E-190-E2 seats up to 120 passengers, while the largest model, the E-195-E2 seats up to 132 passengers. During the late 2000s, Embraer had studied an aircraft of such capacity, dubbed the E-195X, but had discarded the concept in 2010 in light of degraded aircraft performance in the absence of a re-engine. On account of its poor sales and decreasing demand for 70 seat jets, a redesigned counterpart to the E-170 was not pursued.

One key feature of these new variants would be more efficient engines with larger diameter fans; several large engine manufacturers, GE Aviation, Pratt & Whitney, and Rolls-Royce, were all evaluated by Embraer as possible suppliers. During January 2013, it was announced the Pratt & Whitney PW1000G Geared Turbofan engine had been selected to be the exclusive powerplant of the E2. Embraer commercial aircraft president Paulo Cesar de Souza e Silva noted that the PW1000G was the best suited engine for the performance sought by customers. The selection of the PW1000G is likely to have been eased by the parallel development of the smaller PW1200G engine for the Mitsubishi Regional Jet as well as the larger and more mature PW1500G for the Airbus A220.

The E2 family made various improvements in its performance, such as a reduced specific fuel consumption, lower emissions and noise output, minimised maintenance costs, along with the use of a new aluminum or carbon fiber-based wing. These wings had a higher aspect ratio, a longer wingspan, and were equipped with raked wing tips instead of winglets. In early 2013, Embraer referred to this project as being "the E-jets second generation". During June 2013, the $1.7 billion program was launched at the Paris Air Show, citing strong customer demand.

The development programme made extensive use of digital model simulations and static test rigs, enabling rapid progress to be made early on. By May 2016, less than three years after being launched, the E2 had 640 commitments from various airlines and leasing companies, 267 of which were firm orders while 373 were options and purchase rights.