These motions are very simple when taken separately, but when performed together by two different men, experience and quickness in both are required to carry on the work rapidly and harmoniously, without breakages or delays. In loose gravel one cut can be made in a half to three-quarters of a minute; in hard materials one and a half to two minutes, seldom more.

[Illustration: Fig. 15.--Showing Series of Operations for Excavating.]

Steam Shovels and Steam Shovel Work — Part 10

[Illustration: Fig. 16.--Loading Earth from Steam Shovel Onto Cars.]

Steam Shovels and Steam Shovel Work — Part 10

After all material within reach of the dipper has been removed, an unoccupied section of track (generally about 4 ft. long) at the rear of the steam shovel is attached to the dipper by a chain and dragged around the machine to the front (by swinging the dipper horizontally) and there placed in position in line with the sections of track under the machine. The screws at the ends of the jack arm (a horizontal bar at the front end of the machine used for steadying it when cuts are taken at right angles to the steam shovel) are then released, and the machine moved forward three or four feet by throwing the propelling gear into motion. After placing the jack screws into their new position, and tightening them, and blocking the supporting wheels of the steam shovel, the machine is ready for another series of cuts.

Steam Shovels and Steam Shovel Work — Part 10

The regular employees for operating a steam shovel are the engineman, cranesman, fireman and four laborers. The latter are under the supervision of the cranesman, and their duties are to shovel forward any lumps or loose material which may roll down and lodge too close to the front of the steam shovel to be reached by the dipper, to level the surface of the ground in front of the machine, preparing it for the next section of track, to lay these sections of track, to attend to the jack screws and blocking and to act as general utility men.

[Illustration: Fig. 17.--Pole for Breaking Down Edge of Excavation.]

With this crew dry sand and loose gravel can readily be loaded. In harder or more tenacious materials from two to six extra men are required, depending upon the kind of material to be excavated, and also upon good management of the contractor or foreman in charge. Wet sand and fairly loose gravel requires only two extra men, whose duty is to break down the overhanging ledges of these materials which cannot be reached by the dipper, and are liable to fall when the machine has advanced, burying it or blocking the pit behind it. The implement used by these men is a pole, Fig. 17, headed by an iron point, resembling a surveyor's pole. With these poles fairly loose gravel and sand can be readily broken down, sloped at its natural angle, and fed into the pit in front of the steam shovel. In harder materials three to four extra men are usually sufficient, but in very hard or tenacious materials as many as six must be employed. These men break down overhanging material in the face of the bank which cannot be reached by the dipper, bore or drill holes for powder or dynamite when blasting becomes necessary, cut and remove trees, etc.