When filling a trestle the cable cannot be thrown on one side, as described, but must be unhooked from the plow (the rear lot of cars being left standing on the trestle), dragged across the trestle, and there thrown to one side. The forward lot of cars is then backed up until its rear car is opposite the rear end of the cable, when it is loaded, the train backed up, coupled and unloaded, as before described. After unloading the train the cable must again be dragged beyond the trestle, and there thrown to one side of the track and left for the next train. The time required for unloading varies from 10 to 30 minutes, depending upon the nature of the material and the number of cars, and averages about 20 minutes, doing as much work in that time as 20 men can do in a day.

When unloading on curves the operations are delayed by the necessity of using snatch blocks on the cars to insure a nearly tangential pull of the cable and avoid pulling the plow off the car. These blocks are applied as shown in Fig. 90, and at A, Fig. 91. They are hooked to long chains extending over the car and fastened to the bolster or arch bar of the truck. The number of snatch blocks required depends upon the degree of the curve and the length of the cable; generally four to six blocks, one to every third car, are enough. As the plow approaches one of these blocks it must be stopped, block and chain removed and transferred forward for use at that end of the train. The other operations of unloading are the same as when on straight track. The time required in unloading on curves varies from 20 minutes to an hour, and averages about 40 minutes, doing as much work in that time as 20 men can do in a day.

Steam Shovels and Steam Shovel Work — Part 27

The steel wire cables used vary from 1 in. to 1-1/2 ins. diameter. The former are used for unloading loose gravel and sandy material; they are light and easily handled, but cannot bear much jerking. The most usual size is 1-1/4 ins. diameter. Heavier cables require too many men (six to eight) to load them on the car preparatory to starting the plow.

Steam Shovels and Steam Shovel Work — Part 27

One of the heaviest locomotives on the road (preferably one of the consolidation type) should be used for drawing the plow over the cars. These engines are generally able to keep the plow moving with a strong steady pull, avoiding the necessity of taking a run to start the plow, and all injurious jerking of the cable, which frequently breaks it. For tenacious materials and where the haul is not more than 25 miles, it is often good policy to keep one heavy engine at this work, the other engines merely hauling the trains; this can generally be arranged so that no more engines are used than if each engine were to unload its own train. Sometimes two light engines are used for this purpose, but they can seldom move in perfect unison and more or less jerking is the result. Unfortunately the engines for the "mud trains" are not always in the best working order; they are mostly those which are about to go into the shops for turning down the tires or for general repairs, and are not in fit condition for general traffic, but still considered good enough for this service. Expensive delays due to badly working engines are frequently the result.

Steam Shovels and Steam Shovel Work — Part 27