When a ship is to be put through the locks the chain will be let down into great grooves in the floor of the lock. There is a fixed plunger operating within a cylinder, which, in turn, operates within another cylinder, the resulting movement, by a system of pulleys, being made to pay out or pull in 4 feet of chain for every foot the plunger travels. The chain must be raised or lowered in one minute, and always will have to be lowered to permit the passage of a ship. The fender machines are situated in pits in the lock walls. These pits are likely to get filled with water from drippings, leakages, wave action, and drainage, so they are protected with automatic pumps. Float valves are lifted when the water rises in the pits. This automatically moves the switch controlling an electric motor, which starts a pump to working whenever the water gets within 1 inch of the top of the sump beneath the floor of the pit. Twenty-four of these chain fenders are required for the protection of the locks, and each requires two such tension machines.

No ship will be allowed to go through the canal except under the control of a canal pilot. He will certainly bring it to a stop at the approach wall. But if he does not, there is the chain fender. There is not a chance in a thousand for a collision with it, and not a chance in a hundred thousand that the ship will not be stopped when there is such a collision.

The Panama Canal — Part 35

But if the pilot should fail to stop the ship, and it should collide with the fender chain, and then if the fender chain should fail to stop it, there would be the double gates at the head of the lock. There is not one chance in a hundred that a ship, checked as it inevitably would be by the fender chain, could ram down the first, or safety gate. But if it did, there would still be another set of gates some 70 feet away. The chances here might be one in a hundred of the second set being rammed down. From all this it will be seen that the chances of the second pair of gates being rammed is so remote as to be almost without the realm of possibility. But suppose all these precautions should fail, and suddenly the way should be opened for the water of Gatun Lake to rush through the locks at the destructive speed of 20 miles an hour? Even that day has been provided against by the construction of the big emergency dams. The emergency dams, like the fender chains, are designed only for protection, and have no other use in the operation of the locks. There will be six of these dams, one across each of the head locks at Gatun, Pedro Miguel, and Miraflores.

The Panama Canal — Part 35