The Nanjing Metro is a rapid transit system serving the urban and suburban districts of Nanjing, the capital city of Jiangsu Province in the People's Republic of China.

Proposals for a metro system serving Nanjing first began in 1984, with approval by the State Planning Commission granted in 1994. Construction began on the initial 16-station Line 1 in 1999, and opened in 2005. The system has 13 lines and 218 stations running on of track. It is operated and maintained by the Nanjing Metro Group Company. Future expansion plans include 30 lines set to open within the next few years, with several more awaiting approval to begin construction.

Nanjing Metro

History

Early proposals

In 1984 the first serious proposal for construction of a subway appeared in the Municipal People's Congress. In April 1986, the Nanjing Integrated Transport Planning group was established to research on how to implement a subway system in Nanjing. In December 1986 the team published the "Nanjing Metro Initial Phase". The phase consists of a north–south line, east–west line and a diagonal Northwest to Southeast line. The three lines meet in the city center forming a triangle. A revision of the "Nanjing City Master Plan" in 1993 added another line through the urban core, and three light metro lines connecting Nanjing's suburbs in Pukou and the at time proposed new airport. In addition a suburban railway to Longtan was proposed. A 1999 report on "Nanjing city rapid rail transit network planning" further proposed six subway lines, two subway extensions and three light metro lines.

Nanjing Metro

In 1994, the State Planning Commission approved the preparatory work for the subway only to have the entire metro project postponed in 1995 amid a national freeze on new metro projects.

Nanjing Metro

Major changes were made to "Nanjing Urban Rail Transit Network Planning" in 2003. The new master plan consisted of 13 lines, of which nine are subway lines and four are light metro lines. The new Line 6 will be a loop line connecting all the urban radial lines. The plan retained the original lines 1, 2 and 3 from the previous plan. According to the new plan, the initial phase would consist of the completion of Metro Line 1 and 2 by 2010. Together the two lines will form a basic "cross" network. By 2020 the completion of Lines 1, 2, 3, and 4 was to form a more robust "pound" shaped (#) network. Longer-term plans include the construction of a loop line connecting all existing lines. The plan also identified four subway lines crossing the Yangtze river.

First line

The initial section of Line 1 from Maigaoqiao to Xiaohang received final official approval in 1999. In May 2000, the Experimental Station resumed construction with the entire Line 1 project in full construction in December.

A western extension of Line 1 from Xiaohang to a newly built stadium was fast tracked after Nanjing won hosting the National Games. Line 1's initial section and the western extension started trial operations on September 3, 2005, running from Maigaoqiao to Olympic Stadium with 16 stations and a total length of . The opening of the Nanjing Metro Line 1 gave Nanjing the sixth metro system in the Chinese mainland after Beijing, Tianjin, Shanghai, Guangzhou and Shenzhen.

Lines in operation

Line 1

Line 1 runs mainly in a north–south direction. The line starts at Maigaoqiao in the north, heading southwards to CPU (China Pharmaceutical University). The construction of Line 1 began in the year 2000 and was inaugurated on September 3, 2005, with 16 stations and a length of . On May 28, 2010, Line 1's long south extension entered into operation. Thus, before the transfer of Line 1's Olympic Stadium Branch to Line 10, Line 1 was long with 31 stations. The Olympic Stadium branch line broke away from Line 1 and formed parts of Line 10, when the latter's construction finished and entered operation on July 1, 2014. Currently, Line 1 is long with 27 stations. Line 1's color is light blue.

Line 2

Line 2 is long and has 30 stations. It runs mainly in an east–west direction, from Yuzui in the southwest to Jingtianlu in the northeast. It entered into operation on May 28, 2010. On 28 December 2021, the line was extended west with 4 new stations to Yuzui Station. Line 2's color is red.

Line 3

Groundbreaking work for Line 3 started in January 2010. This line, with a north–south orientation, started operation on April 1, 2015 and is in length with 29 stations. Line 3's color is green.