The Borodino-class battlecruisers () were a group of four battlecruisers ordered by the Imperial Russian Navy before World War I. Also referred to as the Izmail class, they were laid down in late 1912 at Saint Petersburg for service with the Baltic Fleet. Construction of the ships was delayed by a lack of capacity among domestic factories and the need to order some components from abroad. The start of World War I slowed their construction still further, as the imported components were often not delivered and domestic production was diverted into areas more immediately useful for the war effort.
Three of the four ships were launched in 1915 and the fourth in 1916. Work on the gun turrets lagged, and it became evident that Russian industry would not be able to complete the ships during the war. The Russian Revolution of 1917 halted all work on the ships, which was never resumed. Although some consideration was given to finishing the hulls that were nearest to completion, the three furthest from completion were sold for scrap by the Soviet Union during the early 1920s. The Soviet Navy proposed to convert Izmail, the ship closest to completion, to an aircraft carrier in 1925, but the plan was cancelled after political manoeuvring by the Red Army cut funding and she was eventually scrapped in 1931.
Design and development
After the end of the Russo-Japanese War of 1905, the Russian Naval General Staff decided that it needed a squadron of fast armoured cruisers that could use their speed to engage the leader of an enemy's battle line, as Admiral Tōgō had done against the Russian fleet during the Battle of Tsushima. The Naval General Staff initially called for a ship with high speed (), guns, and limited protection (a waterline belt of ). The Tsar, head of the Russian government, approved construction of four such ships on 5 May 1911, but the State Duma session ended before the proposal could be voted on. Preliminary bids for the ships were solicited from private builders, but the bids proved to be very high, leading to a reconsideration of the requirements. The Naval General Staff issued a new specification on 1 July 1911 for a ship with a speed of only and with armour increased to . The armament was increased to nine guns in three non-superfiring triple-gun turrets, based on a false rumour that the Germans were increasing the calibre of the guns in their battleships. The Imperial Russian Navy believed that widely separating the main gun turrets and their magazines reduced the chance of a catastrophic ammunition explosion, reduced the silhouette of the ship and improved stability without superfiring turrets and their tall barbettes.
The Naval Ministry solicited new bids on 8 September from 23 shipbuilders, domestic and foreign, but only 7 responded, even after the deadline was extended by a month. Several designs were rejected for not meeting the revised criteria. In the meantime, the Artillery Section of the Main Administration of Shipbuilding had decided that it preferred a four-turret design, and new bids were solicited in May 1912 from the leading contenders from the first round of bidding. The eventual winner was a design by the Admiralty Shipyard in Saint Petersburg which had the extra turret added to a new hull section inserted into the original three-turret design.
The Duma approved construction in May 1912, before the design was finalised, and allocated 45.5 million roubles for each ship. The additional gun turret and consequent increase in the size of the ships led to the ships being overbudget by about 7 million roubles each, and some money was diverted from the budget for the to cover the discrepancy. Orders were placed on 18 September 1912 for a pair of ships each from the Admiralty Shipyard and the Baltic Works, also of Saint Petersburg. The first pair was to be ready for trials on 14 July 1916, and the second pair on 14 September 1916.