Various reasons were given to account for the failure of the workings, but it was most generally believed that it was caused by the doors being swollen with the rain which fell on the Sunday night. That this was not the cause is proved, firstly, by the fact that the doors fell all right when the weight of the prisoner was not on them, and secondly, by the fact that they would not fall with the prisoner on them, even when we had chopped and planed down the sides where it was supposed that they stuck.
The Governor of the Gaol, and the Under-Sheriff, who were present, were terribly upset about the failure of the attempted execution, and the prolonged and terrible suspense in which the prisoner was kept. They were almost frantic about it, but nothing could be done in the matter.
The Under-Sheriff asked me to write out a brief statement of the facts, together with my opinion of the cause of the difficulty, and I give a copy of my letter below.
Executioner's Office, 1, Bilton Place, City Road, Bradford, Yorks., _4th March, 1885._
In accordance with the request contained in your letter of the 30th inst., I beg to say that on the morning of Friday, the 20th ult., I travelled from Bradford to Bristol, and on the morning of Saturday, the 21st, from Bristol to Exeter, arriving at Exeter at 11-50 a.m., when I walked direct to the County Gaol, signed my name in your Gaol Register Book at 12 o'clock exactly. I was shown to the Governor's office, and arranged with him that I would go and dine and return to the Gaol at 2-0. p.m. I accordingly left the Gaol, partook of dinner, and returned at 1-50 p.m., when I was shown to the bedroom allotted to me which was an officer's room in the new Hospital Ward. Shortly afterwards I made an inspection of the place of Execution. The execution was to take place in a Coach-house in which the Prison Van was usually kept. Two Warders accompanied me on the inspection. In the Coach-house I found a Beam about four inches thick, and about a foot in depth, was placed across the top of the Coach-house. Through this beam an iron bolt was fastened with an iron nut on the upper side, and to this bolt a wrought-iron rod was fixed, about three-quarters of a yard long with a hole at the lower end to which the rope was to be attached. Two Trap-doors were placed in the floor of the Coach-house, which is flagged with stone, and these doors cover a pit about 2 yards by 1½ yards across, and about 11 feet deep. On inspecting these doors I found they were only about an inch thick, but to have been constructed properly should have been three or four inches thick. The ironwork of the doors was of a frail kind, and much too weak for the purpose. There was a lever to these doors, and it was placed near the top of them. I pulled the lever and the doors dropped, the catches acting all right. I had the doors raised, and tried the lever a second time, when the catch again acted all right. The Governor was watching me through the window of his office and saw me try the doors. After the examination I went to him, explained how I found the doors, and suggested to him that for future executions new trap-doors should be made about three times as thick as those then fixed. I also suggested that a spring should be fixed in the Wall to hold the doors back when they fell, so that no rebounding occurred, and that the ironwork of the doors should be stronger. The Governor said he would see to these matters in future. I spent all the Sunday in the room allotted to me, and did not go outside the Gaol. I retired to bed about 9-45 that night. The execution was fixed to take place at eight o'clock on the morning of Monday the 23rd ultimo.