The Cruachan Power Station (also known as the Cruachan Dam) is a pumped-storage hydroelectric power station in Argyll and Bute, Scotland. The scheme can provide 440MW of power and produced 705GWh in 2009.

The turbine hall is located inside Ben Cruachan, and the scheme takes water between Cruachan Reservoir to Loch Awe, a height difference of . It is one of only four pumped storage power stations in the United Kingdom, and is capable of providing a black start capability to the National Grid.

Cruachan Power Station

Construction began in 1959 to coincide with the Hunterston A nuclear power station in Ayrshire. Cruachan uses cheap off-peak electricity generated at night to pump water to the higher reservoir, which can then be released during the day to provide power as necessary. The power station is open to visitors, and around 50,000tourists visit it each year.

Cruachan Power Station

Location

The power station is on the A85 road, about west of Dalmally, on a branch of Loch Awe leading to the River Awe, which is the outflow from the loch, at its north west corner. There is a seasonally open Falls of Cruachan railway station nearby.

Cruachan Power Station

History

Construction commenced in 1959, and the power station was opened by Queen Elizabeth II on 15 October 1965. The concept was designed by Sir Edward MacColl, who died before it opened. The civil engineering design of the scheme was carried out by James Williamson & Partners of Glasgow, and the main project contractors were William Tawse of Aberdeen and Edmund Nuttall of Camberley. Consulting electrical engineers were Merz & McLellan of Newcastle upon Tyne. At the peak of the construction, there were around 4,000people working on the project. Thirty-six men died in the construction of the power station and dam. The cost of the scheme was , about in 2021 value.

Cruachan was one of the first reversible pumped-storage systems, where the same turbines are used as both pumps and generators. Previous pumped-storage systems used separate pumps with a network of pipes to return water to the upper reservoir, making them much more expensive to build than conventional hydroelectric systems. Cruachan is predated by the smaller Lünerseewerk (de) of 1958 and the Ffestiniog Power Station of 1963. It is one of four pumped storage schemes in the United Kingdom.

Its construction was linked to that of Hunterston A nuclear power station, to store surplus night-time nuclear generated electrical energy. The power station was originally operated by the North of Scotland Hydro-Electric Board, before being transferred to the South of Scotland Electricity Board. It was owned by Scottish Power from the privatisation of Britain's electricity industry in 1990 until Drax Group purchased it along with other Scottish Power assets on 1 January 2019.

Maintenance of the penstocks, which formerly required them to be drained, is now done using a remotely operated underwater vehicle.

To commemorate the 50th anniversary of the station's opening, a 2015 BBC radio documentary Inside the Rock covered the history of construction.

In June 2021, Drax applied to build a further 600MW pumped storage capacity using the same reservoir, to a combined 1GW for seven hours of storage, approved in July 2023 and possibly operating by 2030. Several financing modes are possible.

Design

The Cruachan station temporarily stores energy at times of low demand, and releases it at times of high demand, when electricity prices are higher, reducing the maximum power that must be provided by power stations. It is also used to cope with sudden surges in the demand for electricity, such as at the end of television programmes. Despite the use of some rainwater, Cruachan is not a net generator of electricity: it uses more energy for pumping water and spinning its turbines than it generates.

Water is pumped from Loch Awe to the upper reservoir, above, during periods of low energy use (such as at night), and then released during the day. The upper reservoir also receives rainwater, supplemented by a network of of tunnels. Around 10% of the energy from the station is generated from rainwater; the rest is from the water pumped up from Loch Awe.

The station is capable of generating of electricity from four turbines, two of and two of capacity, after two units were upgraded in 2005. It can go from standby to full production in twominutes, or 30seconds if compressed air is used to start the turbines spinning. When the top reservoir is full, Cruachan can operate for 22hours before the supply of water is exhausted. At full power, the turbines can pump at per second and generate at per second.