USS Alexander Hamilton (SSBN-617) was a United States ballistic missile submarine. It was the third ship of the United States Navy to be named for Founding Father Alexander Hamilton, the first US Secretary of the Treasury, who was instrumental in the formation of both the United States Coast Guard and the United States Navy.

Construction and commissioning

Alexander Hamiltons keel was laid down on 26 June 1961 at Groton, Connecticut, by the Electric Boat Division of the General Dynamics Corporation. She was launched on 18 August 1962 sponsored by Carolie Frances (Woods) Hollingsworth, the great-great-great granddaughter of Alexander Hamilton, and the wife of Valentine Hollingsworth, Jr., and commissioned on 27 June 1963 with Commander Norman B. Bessac commanding the Blue Crew and Commander Benjamin F. Sherman, Jr., commanding the Gold Crew.

USS Alexander Hamilton (SSBN-617)

Operational history

Between 28 June and 18 October 1963, Alexander Hamilton carried out two shakedown cruises, one for each of her crews. Following those operations, she conducted post-shakedown availability. After trials early in 1964, she departed the United States East Coast on 16 March 1964 to deploy to Rota, Spain, her base of operations. She conducted deterrent patrols out of that port for the remainder of 1964 as a unit of Submarine Squadron 16. In January 1965, she transferred to Submarine Squadron 14 and was rebased at Holy Loch, Scotland. Her cycle of patrols from there lasted until 2 June 1967, at which time she returned to the United States at Charleston, South Carolina. Later that month, she moved north to New London, Connecticut, and from there into the Electric Boat shipyard on 18 June 1967 to begin her first overhaul and nuclear refueling.

USS Alexander Hamilton (SSBN-617)

Alexander Hamilton completed the overhaul on 28 June 1968 and conducted post-overhaul trials, inspections, and shakedown training until early October 1968. In November, she began a deterrent patrol en route to Rota, her new base, where she arrived on 30 December 1968. For the next four years, she operated from Rota as a unit of Submarine Squadron 16.

USS Alexander Hamilton (SSBN-617)

At the conclusion of her 31st deterrent patrol, Alexander Hamilton returned to Charleston in November 1972 and in January 1973 began her second refueling overhaul, combined with a conversion to carry Poseidon missiles, at the shipyard of the Newport News Shipbuilding and Dry Dock Company. The work on those two modifications lasted for over two years. Upon its completion, she carried out shakedown in April 1975 and devoted the remainder of the year to training and various post-overhaul trials. She conducted her 32nd and 33rd deterrent patrols in the early part of 1976. Alexander Hamilton concluded the 33rd patrol at Holy Loch in May 1976 and conducted her next three deterrent patrols from that base. While on her 35th patrol, she visited Port Canaveral, Florida, and New London, Connecticut, before concluding that patrol at Charleston in March 1977. During March and April 1977, she completed refit and conducted refresher training. In July 1977, she departed Charleston for another deterrent patrol which ended with her arrival at Holy Loch in September 1977.