USS Chivo (SS-341), a submarine, was a ship of the United States Navy named for the "chivo" or big-scaled goatfish Pseudopenaeus grandisquamis, a fish inhabiting the Pacific Ocean between Panama and Mexico.
Chivo was launched 14 January 1945 by Electric Boat Company, Groton, Conn.; sponsored by Mrs. Edith Lindholm Baldwin, wife of Raymond E. Baldwin, the governor of Connecticut; and commissioned 28 April 1945.
1945–1950
Chivo departed New London 7 June 1945 for Key West where she trained and exercised briefly at the sound school and experimental torpedo range, before sailing on to Pearl Harbor in company with and . While the submarine was preparing for her first war patrol, hostilities ended; Chivo then remained at Pearl Harbor, operating locally with other ships of the Pacific Fleet. Assigned to Submarine Squadron Seven (SubRon 7), she returned to the States in October, basing out of San Diego, California for local operations which continued until January 1946, when Chivo sailed for a short tour of duty operating out of Subic Bay in the Philippines. Returning to San Diego in May, the submarine exercised along the west coast for the next 15 months, a period culminating in an overhaul at Mare Island Naval Shipyard.
Growing tensions in Asia, provoked in part by French conflict with the Vietminh in Indochina and disagreements over the future of Korea, encouraged the Navy to conduct more realistic training for submariners. As part of this general approach, Chivo began a three-month simulated war patrol in August 1947 which took her to Suva, Fiji Islands; Guam; and Japan; before she arrived back at San Diego in November. West coast duty continued for her until mid-1949 when she was transferred to the Atlantic Fleet, arriving at her new home port of Naval Station Key West and Submarine Squadron Four (SubRon 4) on 4 July 1949. During her transit there the boat's movement reports describe one of the hazards of sailing in the warm waters in the West Indies when Chivo "struck unidentified submerged object, possibly turtle." The submarine provided training and services for Atlantic Fleet ships in intertype exercises until 30 October 1950 when she arrived at New London to begin an extensive Greater Underwater Propulsion Program (GUPPY 1-A) overhaul and modernization. The modifications included streamlining the hull and superstructure, adding a snorkel to allow diesel engine operation while at periscope depth and increasing overall battery power.
1951–1960
With increased power and a new streamlined shape, Chivo returned to duty with the Atlantic Fleet in July 1951, resuming anti-submarine warfare (ASW) training operations with surface ships as well as maintaining proficiency in anti-shipping and mine warfare. These drills and exercises took place mainly off Key West and Guantanamo Bay. This regular training continued until 19 April 1952 when Chivo sailed for a short cruise with the 6th Fleet in the Mediterranean, visiting Augusta, Sicily; Cannes and Marseille, France; and Naples, Italy; before returning home via the Azores in June.