German submarine U-353 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 30 March 1940 at the Flensburger Schiffbau-Gesellschaft yard at Flensburg, launched on 11 November 1941, and commissioned on 31 March 1942 under the command of Oberleutnant zur See Wolfgang Römer. After training with the 5th U-boat Flotilla based at Kiel, U-353 was transferred to the 1st U-boat Flotilla at Brest in France for front-line service from 1 October 1942.

U-353 was sunk on her first and only combat patrol at 15:02 GMT on 16 October 1942 in the North Atlantic after being rammed and depth-charged by the destroyer , in position , while about to attack Convoy SC 104. Six of the crew were killed and 39 survived the attack.

German submarine U-353

She did not sink any ships.

German submarine U-353

Design

German Type VIIC submarines were preceded by the shorter Type VIIB submarines. U-353 had a displacement of when at the surface and while submerged. She had a total length of , a pressure hull length of , a beam of , a height of , and a draught of . The submarine was powered by two Germaniawerft F46 four-stroke, six-cylinder supercharged diesel engines producing a total of for use while surfaced, two AEG GU 460/8–27 double-acting electric motors producing a total of for use while submerged. She had two shafts and two propellers. The boat was capable of operating at depths of up to .

German submarine U-353

The submarine had a maximum surface speed of and a maximum submerged speed of . When submerged, the boat could operate for at ; when surfaced, she could travel at . U-353 was fitted with five torpedo tubes (four fitted at the bow and one at the stern), fourteen torpedoes, one SK C/35 naval gun, 220 rounds, and a C/30 anti-aircraft gun. The boat had a complement of between forty-four and sixty.

Service history

Commissioning and training

U-353 was ready for commissioning in early February 1942, but this was delayed until 31 March by ice in the Baltic Sea. Her U-Bootsabnahmekommission trials (UAK, "U-Boats Acceptance Commission") at Kiel was delayed by three weeks because of the number of U-boats already there, so she remained at Flensburg, performing exercises. The U-boat finally arrived at Kiel on about 21 April, taking the normal UAK trials in Kiel Fjord. She also entered the pressure dock at the Deutsche Werke shipyard and was tested to the equivalent depth of . The UAK trials lasted until about 20 May.

U-353 then proceeded to Rønne (on the Danish island of Bornholm, in the western Baltic), for silent running tests, but these were interrupted by the threat of Russian submarines. She consequently sailed to Danzig, arriving about 23 May, proceeding immediately to Königsberg, where she put into the Schichau shipyard for a few days for minor repairs. She then sailed to Gotenhafen (Gdnyia, Poland), where she spent about five days in torpedo firing exercises, and then to Hela (now Hel, Poland) for the Ausbildungsgruppe Front ("Training Group Front") technical and dive training, which lasted about four weeks. U-353 returned to Rönne for a week of silent running tests, then arrived back at Flensburg for final adjustments and crew leave on 11 July. There the boat was fitted with a Metox radar detector. In mid-August she sailed to Gdingen for tactical exercises, which lasted until early September. On 11 September U-353 arrived back at Kiel for fitting-out, fuelling, and embarked provisions and torpedoes.

Combat patrol

U-353 sailed from Kiel at 07:00 on 22 September 1942, accompanied by two other U-boats and for a short distance by two Sperrbrecher (lit. "Pathmaker", in English "Minesweeper"). She was provisioned for ten weeks and carried 130 tons of fuel oil. It was expected that she would remain at sea for just over eight weeks, before arriving at Brest, where she would join the 1st U-boat Flotilla.