In railway signalling, an interlocking is an arrangement of signal apparatus that prevents conflicting movements through an arrangement of tracks such as junctions or crossings. In North America, a set of signalling appliances and tracks interlocked together are sometimes collectively referred to as an interlocking plant or just as an interlocking. An interlocking system is designed so that it is impossible to display a signal to proceed unless the route to be used is proven safe.

Interlocking is a safety measure designed to prevent signals and points/switches from being changed in an improper sequence. For example, interlocking would prevent a signal from being changed to indicate a diverging route, unless the corresponding points/switches had been changed first. In North America, the official railroad definition of interlocking is: "An arrangement of signals and signal appliances so interconnected that their movements must succeed each other in proper sequence".

Interlocking

Configuration and use

A minimal interlocking consists of signals, but usually includes additional appliances such as points and Facing Point locks (US: switches) and derails, and may include crossings at grade and movable bridges. Some of the fundamental principles of interlocking include: Signals may not be operated to permit conflicting train movements to take place at the same time on set route. Switches and other appliances in the route must be properly 'set' (in position) before a signal may allow train movements to enter that route. Once a route is set and a train is given a signal to proceed over that route, all switches and other movable appliances in the route are locked in position until either the train passes out of the portion of the route affected, or the signal to proceed is withdrawn and sufficient time has passed to ensure that a train approaching that route has had opportunity to come to a stop before passing the signal.

Interlocking

History

Railway interlocking is of British origin, where numerous patents were granted. In June 1856, John Saxby received the first patent for interlocking switches and signals. In 1868, Saxby (of Saxby & Farmer) was awarded a patent for what is known today in North America as “preliminary latch locking”. Preliminary latch locking became so successful that by 1873, 13,000 mechanical locking levers were employed on the London and North Western Railway alone.

Interlocking

The first experiment with mechanical interlocking in the United States took place in 1875 by J. M. Toucey and William Buchanan at Spuyten Duyvil Junction in New York on the New York Central and Hudson River Railroad (NYC&HRR). At the time, Toucey was General Superintendent and Buchanan was Superintendent of Machinery on the NYC&HRR. Toucey and Buchanan formed the Toucey and Buchanan Interlocking Switch and Signal Company in Harrisburg, Pennsylvania in 1878. The first important installations of their mechanism were on the switches and signals of the Manhattan Elevated Railroad Company and the New York Elevated Railroad Company in 1877–78. Compared to Saxby's design, Toucey and Buchanans' interlocking mechanism was more cumbersome and less sophisticated, and so was not implemented very widely. Union Switch & Signal bought their company in 1882.

As technology advanced the railway signaling industry looked to incorporate these new technologies into interlockings to increase the speed of route setting, the number of appliances controlled from a single point and to expand the distance that those same appliances could be operated from the point of control. The challenge facing the signal industry was achieving the same level of safety and reliability that was inherent to purely mechanical systems. An experimental hydro-pneumatic interlocking was installed at the Bound Brook, New Jersey junction of the Philadelphia and Reading Railroad and the Lehigh Valley Railroad in 1884. By 1891, there were 18 hydro-pneumatic plants, on six railroads, operating a total of 482 levers. The installations worked, but there were serious defects in the design, and little saving of labour was achieved.

The inventors of the hydro-pneumatic system moved forward to an electro-pneumatic system in 1891 and this system, best identified with the Union Switch & Signal Company, was first installed on the Chicago and Northern Pacific Railroad at its drawbridge across the Chicago River. By 1900, 54 electro-pneumatic interlocking plants, controlling a total of 1,864 interlocking levers, were in use on 13 North American railroads. This type of system would remain one of two viable competing systems into the future, although it did have the disadvantage of needing extra single-use equipment and requiring high maintenance.