[113] EUSAK _Cmd Rpt_, Mar 51, Sec 1, 53.

The name of the new drive was to be Operation RIPPER, and it was to jump off as soon as possible after the finish of KILLER.

U.S. Marine Operations in Korea 1950-1953 Volume IV (of 5) — Part 63

From newly won positions in the high ground south of Hoengsong, the Marines could look across the soggy plain to their Phase II objectives, the hills to the north of the battered town. Hoengsong occupied a valley at the confluence of two rain-swollen streams. Thus a triangular area of low, flat ground lay between the ruins and the hills which must be taken in the final phase of Operation KILLER. The 1st and 7th Marines were the combat units, with the 5th Marines in reserve. (The KMC Regiment, it may be recalled, had been temporarily detached for service with the ROK army.)

U.S. Marine Operations in Korea 1950-1953 Volume IV (of 5) — Part 63

Before the 1st and 7th Marines could launch their combined attack, the latter had to fight its way up to the point of junction after relieving elements of the 6th ROK Division.[114] The scheme of maneuver then called for Lieutenant Colonel Virgil W. Banning’s 3/1 to sideslip into the zone of Major Maurice E. Roach’s 3/7, in order to be in position for the advance across the Hoengsong plain. This meant a crossing of the river Som for 3/1 and a combined assault with 3/7 on the high ground along the west bank.

U.S. Marine Operations in Korea 1950-1953 Volume IV (of 5) — Part 63

[114] Except when otherwise noted, this section is derived from the 1stMarDiv _HD_, Mar 51, 2–5; 7thMar _HD_, Mar 51, 2–6; IX Corps _Cmd Rpt_ No. 4, Mar 51, 31–32; EUSAK _Cmd Rpt_, Sec 1, Mar 51, 53–59; LtCol Edwin H. Simmons narrative, n.d.; Comment by Col Wilbur F. Meyerhoff.

The problem of crossing the river, 200 feet wide and chest-deep at the most likely site, was turned over to Banning with the explanation that the engineer company supporting the regiment could not be diverted from road repairs. To meet this emergency Major Edwin H. Simmons, commanding Weapons Company of 3/1, produced a field manual with instructions for building a “Swiss bent bridge.”[115] His Antitank Assault Platoon was given the task under the command of energetic Technical Sergeant Carmelo J. Randazzo, a veteran on his third enlistment.

[115] FM 70-10, _Mountain Operations_, 41–46.

There was no lack of trees for timbers, and rolls of telephone wire were sworn to be beyond salvaging by the battalion communications officer. The A-shaped bents, or trusses, were lashed together with wire and enthusiasm, then carried out into the ice-cold water to be attached to spars and stringers.