Muara Town () or simply Muara is a port town in Brunei-Muara District, Brunei, about from the capital Bandar Seri Begawan. The population of the town proper was 2,102 in 2016. It is home to Muara Port, the country's primary deep water port.
Name
The name Muara seems rather natural. Because Muara is the Malay term for river mouth and it is where the large river entrance into Brunei lies, thus the name Muara was chosen.
Location
Muara can be found in Mukim Serasa and is located on the easternmost tip of West Brunei. It lends its name to the district which it is in, the Brunei-Muara district. To the north is the South China Sea, to the south is the Brunei Bay, and across the bay is Pulau Muara Besar. To the east, across a man-made channel, are the remains of Tanjung Pelumpong (Cape Pelumpong, now an island). The rest of the Brunei-Muara district is situated on the west side. Serasa lies to the south-west of Muara.
History
Before the 1900s, the village of Muara was inhabited by a small group of Malay fishermen.Rapid development was seen in the area of Serai Pimping in 1883 to extract coal, which was used to fuel passing steamships; later, under the government of Sarawak, the area around the settlement was developed and was named Brooketon, after Charles Brooke, the White Rajah of Sarawak, in 1889.
The development of the Brooketon Colliery coal mine also led to transport and infrastructure development in Muara. A wooden railway was built to transport the coal to the deep-water anchorage at Muara, and wharves and jetties were built to allow steamships and barges to berth. By 1911, more than 1,447 people lived in Muara and some 30 shops had opened in the town. Brooketon was also where the first postage stamp in Brunei was issued.
Although he only had economic privileges, Brooke became the de facto political ruler of the area. The coal mines employed hundreds of miners, which compelled Brooke to introduce a police force, a post office, and roads, effectively transforming Muara into an extraterritorial extension of Sarawak. It was not until 1921 that Muara was "returned" to Brunei. The mine closed in 1924 because of heavy financial losses caused by the continuously decreasing price of coal during the world economic recession.
The Japanese occupied Brunei during Second World War and attempted unsuccessfully to reopen the coal mine. Brooketon was the landing location of the Australian forces as part of the Borneo Campaign, at the end of the war, which liberated Brunei from Japanese occupation.
Under the rule of Sultan Omar Ali Saifuddin III, the area was developed into a deepwater port to assist in the development of the country. Since 1973, Muara Port has undergone extensive improvements. These include extensions to the wharf, bringing its total length to 948 meters (including 250 meters dedicated container wharf and 87 metres aggregate wharf). The overall covered storage capacity is 16,950 square meters. The site also features long storage warehouses with a combined capacity of 16,630 square meters and open storage space of 5 hectares. Facilities for the dedicated container wharf cover an area of 92,034 square meters, including 8,034 square metres of covered areas.
Administration
Pekan Muara is an unincorporated town; it does not have a municipal body. Instead, the town is officially a village subdivision, whereby it is one of the villages within Mukim Serasa.
The town has the postcode is BT1128.
Muara was formerly part of the separate Muara district until in 1938 when it became part of the present-day Brunei-Muara district.
Economy
Part of the deepwater port of Muara is occupied by two Royal Dutch Shell petroleum facilities. Brunei Shell Marketing maintains a large presence in Muara through its Muara Terminal. There are numerous bottled gas containers on the site and a number of tanks holding various products, including bitumen.
The Majlis Perundingan Kampung (MPK) of Masjid Lama, Pekan Muara, Sabun dan Pelumpong labored and developed a project that was centered on sea fish, specifically the Lumai Fish Snack Project, in an effort to react to the Ministry of Home Affairs' request to actualize the dream of "One Village, One Product". With a gathering of 32 individuals, this activity profited from the collecting of BND10 from community members and villages. The preparation and acquisition of necessary supplies, the acquisition of raw materials, the washing, drying, cooking, packing, and marketing of the Lumai Fish Snack product are all included in the manufacturing phase.