This article describes energy and electricity production, consumption, import and export in Kenya. Kenya's current effective installed (grid connected) electricity capacity is 2,651 megawatts (MW), with peak demand of 1,912 MW, as of November 2019. At that time, demand was rising at a calculated rate of 3.6 percent annually, given that peak demand was 1,770 MW, at the beginning of 2018. Electricity supply is mostly generated by renewable sources with the majority coming from geothermal power and hydroelectricity.

Until recently the country lacked significant domestic reserves of fossil fuel. The country has over the years had to import substantial amounts of crude oil and natural gas. This might change with the discovery of oil reserves in Kenya, which relied on oil imports to meet about 42 percent of its energy needs in 2010. As of the end of June 2016, 55% of Kenyans were connected to the National grid, which is one of the highest connection rates in Sub-Saharan Africa. Per capita consumption in domestic households however, remains low.

Energy in Kenya

Electricity

Sources of electricity

Renewable energy

Kenya is currently the largest producer of geothermal energy in Africa. It is one of two countries in Africa that produce geothermal energy, the other being Ethiopia. In 2010, geothermal energy accounted for almost 20 percent of Kenya's total electricity generation. The country has the potential to produce 10,000 megawatts of geothermal-powered electricity, according to Kenya's state-owned Geothermal Development Company. Total renewable energy capacity is at 60%, with most coming from hydropower. In July 2019, Kenya opened Lake Turkana Wind Power (LTWP) which is the largest wind power plant in Africa. This project is part of the country's ambitious plan of reaching 100% green energy by 2020.

Energy in Kenya

Hydroelectric power

Utilities

The bulk of electricity is transmitted by Kenya Electricity Transmission Company.

Energy in Kenya

In Kenya, there are plans by the government of Kenya, to end the monopoly of the electricity distribution market; but until that happens, power distribution is only held by one company; Kenya Power and Lighting Company (Kenya Power).

However, Kenya Electricity Generating Company (KenGen), is responsible for generating approximately 90% of installed capacity. Independent Power Producers (IPPs) are responsible for about 10% of installed capacity. The following IPPs are active in Kenya: (a) Westmont (b) AEP Energy Africa (Iberafrica) (c) OrPower4 Kenya Limited (a subsidiary of Ormat Technologies) (d) Tsavo Power Company (e) Aggreko (f) Africa Geothermal International

Consumption

The biggest consumer of electricity in Kenya is Kenya Pipeline Company, followed by Bamburi Cement. As of July 2018, of the 6.5 million Kenya Power's customers, 5 percent or 348,459, were commercial customers (including businesses and factories). Of these, the largest 6,000, were responsible for 60 percent of the national power consumption, averaging in excess of 15,000 electricity units per month. Peak consumption around 1,830 MW often occurs 1940hrs while baseload (minimum demand) of about 900MW happens at 3:30 am. Average electricity consumption per citizen is 167 kilowatt hours (kWh) per year. From November 2018, households and businesses consuming less than 100 kWh/month pay a subsidized rate of KSh.10/= per kWh.

Future

Sources of electricity

One estimate of projected electricity supply and demand as follows:

Projected generation mix according to nuclear agency

OBS: Not official plan

Rural electrification

Karanja describes the role that a coordinated approach to rural electrification can play. Numerical electricity system modeling combined with geographical information can provide useful inputs.

Eastern Africa Power Pool (EAPP)

Seven countries came together because they saw mutual benefit in having one power pool. The original countries were (a) Burundi (b) Democratic Republic of the Congo (c) Egypt (d) Ethiopia (e) Kenya (f) Rwanda and (g) Sudan.

Later, more countries joined the pool: (a) Tanzania (b) Libya (c) Djibouti and (d) Uganda.

The objective of the Eastern Africa Power Pool (EAPP) is to increase the volume and reduce the cost of electricity supply in Kenya; and to provide revenues to Ethiopia through the export of electricity from Ethiopia to Kenya. The process of connecting the Ethiopian grid to the Kenyan grid is underway via the Sodo–Moyale–Suswa High Voltage Power Line.

Kenya also plans to be connected to the South African grid, through Tanzania, Zambia and Zimbabwe. That process is also underway as of July 2018, via the Isinya–Singida High Voltage Power Line.