Money was again collected in 1721 by letters patent, and this was spent on repairing the ceilings. About the same time a legacy was spent in repaving the nave, and the west ends of the aisles were blocked by brick walls. Some slight repairs were done about 1764, when a fresh collection was made.

More extensive repairs were made in 1832: the roof was releaded, such of the clerestory windows as had been closed were reglazed, and the south window of the transept was rebuilt in stone. The choir, after the repairs, was opened for service in 1833. The nave to the west of the rood-screen was more or less in a dilapidated condition, protected by the releaded roof, but not used. The presbytery had been fitted up in Georgian style as a chancel, the organ stood in the north arm of the transept, and high pews filled the choir westward as far as the rood-screen. This was the condition of the part of the church which was used up to 1870.

Bell's Cathedrals: The Cathedral Church of Saint Albans — Part 12

In 1856 a scheme was started for getting the Abbey Church raised to cathedral rank, and also for restoring the fabric. Mr. (afterwards Sir) Gilbert Scott was appointed architect, and was empowered to do what he thought most pressing as far as funds would allow; the flat roof of the north aisle was renewed, drainage attended to, and foundations strengthened; the floor at the south end of the transept was lowered--it will be remembered that it had been raised in 1692--the vaults were filled with concrete, and the floor repaved. The presbytery was repaved with tiles copied from some old ones. The Georgian fittings were removed to the nave; fragments of the tabernacles, which we now see over the doors leading from the aisles into the presbytery, having been discovered, the tabernacles were reconstructed of the old with some new material. But more important work had to be undertaken in 1870. On Sunday, July 31st, the sound of cracking was heard in the tower, and Mr. J. Chapple, the clerk of the works, went up the next day to London to see Scott and asked him to come down at once to examine the tower; plaster was put over the crack to see if it was increasing or not. There were soon signs that the mischief was getting worse, and Scott ordered the tower to be shored up with timber, and temporary brick walls to be built below it. It seemed that the rubble of the eastern piers had been made of mortar which had turned into dust, and that a big hole had been cut in the south-eastern pier. This, according to Lord Grimthorpe, had apparently been done with the intention of demolishing the tower, probably soon after the time of the dissolution of the monastery, for the hole contained timber shores which were sufficient to support the tower while the workmen were enlarging the hole, but which were probably intended to be set on fire and burnt away, thus allowing the workmen to escape before the tower fell. This wood was found partially decayed, and probably to its state the settlement of the tower was partially due. The hole was, by Scott's direction, filled with bricks laid in cement, and cement was poured in to fill up all the interstices; some of the decayed rubble was cut out of the piers and brickwork put in to take its place: the walls were tied with Yorkshire flagstone and iron rods, and were grouted with liquid cement wherever possible. It was an anxious time for those in charge of the work; it was only after many days and nights of incessant labour, that they felt sure that the sinking of the tower was arrested and that the new work was holding up the weight.

Bell's Cathedrals: The Cathedral Church of Saint Albans — Part 12