"And I can't give you much information here. We'll want to get aboard an inspection car and run right through. That'll be a job for to-morrow. We'll have the inspector's car, and run along to the other side. But, see here, this canal's the biggest thing in canals that's ever been thought of. The Suez Canal don't hold a candle to it. The Kiel Canal is an infant when compared with what this will be when it's finished. There's fifty miles, or thereabouts, of solid dirt between Colon and Panama, and America has decided to get to at that dirt and cut a way clear through it, a way not only big enough to take ships of to-day, but to take ships of to-morrow, ships that'll make the world open its eyes and exclaim."

The very mention of the work made Jim gasp. He asked for particulars promptly. "It'll take a heap of time, I expect," he said. "Reckon a canal a mile long and fifty feet wide by thirty deep isn't dug in a day."

The Hero of Panama — Part 32

"Nor hardly in a year. But we're not digging all the way," explained Phineas. "America has selected what is known as the high-level canal; that is, she's not just digging a track clear through from Atlantic to Pacific, a tide-level canal as you might call it, for there are difficulties against such a scheme. To begin with, there's a tide to be reckoned with at Panama, while this Atlantic end has none; which means your water level at the Pacific side is different from that at the Atlantic. Then there's river water to be contended with. This isthmus gets a full share of rain, particularly near the Atlantic, and the rivers get packed with water in a matter of a few hours. Well, you've got to do something, or that flood will swamp your canal, wash away your works, and do other damage."

The Hero of Panama — Part 32

"Then the high level has fewer difficulties?" asked Jim.

The Hero of Panama — Part 32

"You may say so, though the job is big enough in all conscience. Shortly put, it's this. We begin the canal by dredging in Limon Bay, right here beside Colon, and cut our dirt away, in all for a matter of just over seven miles. Then we build three tiers of double locks, which will take any vessel, and which will float them up in steps to the 85-foot level. Once up there the ship steams into a huge lake where there's dry land to-day. We get that lake by damming the Chagres River right there before us, at Gatun, throwing the water back into a long natural hollow, and when the work is finished we shall have a body of water there four-fifths the size of Lake Geneva. Anyway, it'll allow a steamer to get along under her own power till she arrives at the other end of the lake at Obispo. Even then she uses her own power, though she has to slow down. She enters what we call the Culebra cut, just nine miles long, where we are burrowing our way through the hills. That's one of the biggest of our jobs. You'll be interested when you see it. We've a small army of men at work, and rock drills and steam shovels are going all day, while dirt trains travel to and fro more often than electrics in the New York subway. Then comes a lock at Pedro Miguel, and another at Milaflores, which let our ships down to Pacific level. Way down at that end we've a lot of dredging to do to clear the below-sea track of the canal."